Power plant · Aberdeenshire, Scotland, United Kingdom
Clashindarroch
Clashindarroch is a power plant in Aberdeenshire, Scotland, United Kingdom, with 37 MW of capacity, operated by Vattenfall.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Aberdeenshire (coordinates), Scotland | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Address | Clashindarroch Forest, Huntly, | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Status | Operating (operational) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Start year | 2015 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Onshore or offshore | Onshore | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Permit date | 14 Dec 2010 (permit APP/2009/1380, Town and Country Planning Act, issued by Aberdeenshire) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Application date | 1 Jun 2009 (reference APP/2009/1380, planning authority Aberdeenshire) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Decision date | 14 Dec 2010 (granted, reference APP/2009/1380, planning authority Aberdeenshire) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Operator | Vattenfall | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Capacity | 37 MW | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Units | 18 units (2.05 MW per unit) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Technology | Wind Onshore | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Coordinates | 57.3682, -2.8631 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.
Request researchLatest events
Dated events about this power plant from official notices and registers, newest first. All recent changes.
- Commissioned
- Permit granted (planning authority Aberdeenshire, reference APP/2009/1380)
- Permit applied for (planning authority Aberdeenshire, reference APP/2009/1380)
How it compares
Clashindarroch is the 251st-largest of 1,196 power plants in Scotland and the 622nd-largest of 5,050 in the United Kingdom by capacity; its 37 MW is <0.1% of the 115,622 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.
| Within | Rank | Total | Share |
|---|---|---|---|
| Scotland | 251st of 1,196 | 34,589 MW | 0.11% |
| United Kingdom | 622nd of 5,050 | 115,622 MW | <0.1% |
| All power plants in our data | 2,428th of 12,032 | 1,190,447 MW | <0.1% |
Timeline
Dated facts about this power plant from its sources, oldest first.
- Started operating
Nearby
Within 50 km of this power plant: 119 grid connections (54 operating, 558 MW), 67 substations and 1 data center, measured from the coordinates in the facts above. The table shows the nearest 7, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Wheedlemont Wind grid connection | Grid connection | 1.62 MW | Operating | 4.6 km |
| Clashindarroch Wind Farm 2 - Addcap grid connection | Grid connection | 77 MW | Planned | 6.9 km |
| Cairnmore Wind Park grid connection | Grid connection | 7.27 MW | Operating | 6.9 km |
| Huntly Primary | Substation | — | — | 9.2 km |
| Cairnford GSP | Substation | — | — | 9.4 km |
| Mossat Primary | Substation | — | — | 11 km |
| Brightsolid | Data center | — | — | 49 km |
Operator and place
More from Vattenfall
- Thanet (extension)340 MW
- Thanet300 MW
- South Kyle Wind Farm240 MW
- Pen Y Cymoedd228 MW
- Ormonde Offshore150 MW
- Aultmore Forest - Buckie - Windfarm106 MW · planned
- Ourack105 MW · permitted
- European Offshore Wind Deployment Centre (EOWDC) (Aberdeen Bay - Demonstration site)96.8 MW
Other power plants in Scotland
- Seagreen1,075 MW
- Moray East950 MW
- Moray West Offshore Wind Farm Project882 MW
- Lewis Wind Farm (Barvas Moor)652 MW
- Beatrice588 MW
- Neart na Gaoithe450 MW
- Viking Wind Farm443 MW
- Cruachan440 MW
Data on this page
- Contains public sector information licensed under the Open Government Licence v3.0. DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- JRC Open Power Plants Database (JRC-PPDB-OPEN), European Commission, Joint Research Centre. JRC Open Power Plants Database (JRC-PPDB-OPEN), CC BY 4.0.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- Dutch power station owners' and operators' pages. Dutch power station owners' and operators' pages, Facts only, each linked to its page.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- Contains public sector information licensed under the Open Government Licence v3.0. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.
- SSEN Distribution. SSEN Distribution data portal, CC BY 4.0.