Grid connection · Scotland, United Kingdom

Burgar Hill grid connection

Burgar Hill grid connection is a grid connection in Scotland, United Kingdom, with 2.19 MW of capacity, held by Burgar Hill Renewables Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
Name in the sourceBURGAR HILL grid connectionSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
LocationScotland (connects at Scorradale)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
StatusOperating (connected)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
HolderBurgar Hill Renewables LimitedSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Attached toBurgar Hill (land Near), Evie (matched by shared name+coordinates+technology+capacity, 1.56 km away)Rare Context entity resolution · CC0 1.0 · checked 24 Oct 2026
Capacity2.19 MWSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
TechnologyWindSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Grid operatorScottish Hydro Electric Power Distribution plcSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Voltage33 kVSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Coordinates59.1169, -3.1192SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026

Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.

Request research

Latest events

Dated events about this grid connection and the records linked to it from official notices and registers, newest first. All recent changes.

  1. Commissioned: Burgar Hill (land Near), Evie
  2. Permit granted: Burgar Hill (land Near), Evie (planning authority Orkney Islands, reference 07/422/PPF)
  3. Permit applied for: Burgar Hill (land Near), Evie (planning authority Orkney Islands, reference 07/422/PPF)

How it compares

Burgar Hill grid connection is the 1,018th-largest of 1,192 grid connections in Scotland and the 3,299th-largest of 3,903 in the United Kingdom by capacity; its 2.19 MW is <0.1% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
Scotland1,018th of 1,19288,894 MW<0.1%
United Kingdom3,299th of 3,903446,745 MW<0.1%
All grid connections in our data7,305th of 7,9281,372,494 MW<0.1%

Nearby

Within 50 km of this grid connection: 50 power plants (18 operating, 52.2 MW) and 15 substations, measured from the coordinates in the facts above. The table shows the nearest 6, up to 3 per kind.

NameKindSizeStatusDistance
Evie Wind Energy ProjectPower plant2.3 MWCancelled1.2 km
Thorfinn Wind Farm - NM2000Power plant2.3 MWOperating1.2 km
Thorfinn Wind Farm - NM1500Power plant1.5 MWOperating1.2 km
Burgar Hill PrimarySubstation——1.6 km
Rousay PrimarySubstation——9.0 km
Shapinsay PrimarySubstation——15 km

Holder, grid operator and place

More from Burgar Hill Renewables Limited

Other grid connections in Scotland

All 1192 grid connections in Scotland, United Kingdom

Data on this page