Grid connection · Scotland, United Kingdom

Auchteraw Farm grid connection

Auchteraw Farm grid connection is a grid connection in Scotland, United Kingdom, with 47.4 MW of capacity, held by Field Auchteraw Ltd.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
Name in the sourceAUCHTERAW FARM grid connectionSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
LocationScotland (connects at Fort Augustus Grid)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
StatusOperating (connected)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
HolderField Auchteraw LtdSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Attached toFort Augustus GSP (via a primary substation)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Attached toTorrdhuin, Auchteraw Battery Storage Facility (matched by shared name+coordinates+technology+capacity+company, 1.17 km away)Rare Context entity resolution · CC0 1.0 · checked 24 Oct 2026
Capacity47.4 MWSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
TechnologyBattery storageSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Grid operatorScottish Hydro ElectricSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Voltage33 kVSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Coordinates57.1395, -4.7166SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026

Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.

Request research

Latest events

Dated events about this grid connection and the records linked to it from official notices and registers, newest first. All recent changes.

  1. Commissioned: Torrdhuin, Auchteraw Battery Storage Facility
  2. Permit granted: Torrdhuin, Auchteraw Battery Storage Facility (planning authority Highland, reference 20/04565/FUL)
  3. Permit applied for: Torrdhuin, Auchteraw Battery Storage Facility (planning authority Highland, reference 20/04565/FUL)

How it compares

Auchteraw Farm grid connection is the 317th-largest of 1,192 grid connections in Scotland and the 1,053rd-largest of 3,903 in the United Kingdom by capacity; its 47.4 MW is <0.1% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
Scotland317th of 1,19288,894 MW<0.1%
United Kingdom1,053rd of 3,903446,745 MW<0.1%
All grid connections in our data4,443rd of 7,9281,372,494 MW<0.1%

Nearby

Within 50 km of this grid connection: 125 power plants (52 operating, 1,993 MW) and 41 substations, measured from the coordinates in the facts above. The table shows the nearest 6, up to 3 per kind.

NameKindSizeStatusDistance
Fort Augustus GSPSubstation——0.3 km
Auchteraw Energy StoragePower plant20 MWCancelled1.2 km
Torrdhuin, Auchteraw Battery Storage FacilityPower plant49.9 MWOperating1.2 km
Bunoich PrimarySubstation——2.2 km
Culachy Wind FarmPower plant57.6 MWCancelled3.5 km
Glendoe PrimarySubstation——4.3 km

Holder, grid operator and place

Other grid connections in Scotland

All 1192 grid connections in Scotland, United Kingdom