Grid connection · England, United Kingdom

Wind 1.995 MW grid connection at First Avenue

Wind 1.995 MW grid connection at First Avenue is a grid connection in England, United Kingdom, with 2 MW of capacity, connected by Northern Powergrid (Yorkshire) plc.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEngland (connects at First Avenue)Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
StatusOperating (connected)Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Attached toFirst Avenue (via a primary substation)Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Capacity2 MWNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
TechnologyWindNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Grid operatorNorthern Powergrid (Yorkshire) plcNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Connection date17 Jun 2008Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Voltage11 kVNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Coordinates53.7714, -0.3418Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026

Research on this grid connection and its grid operator.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the grid operator.

Request research

How it compares

Wind 1.995 MW grid connection at First Avenue is the 2,206th-largest of 2,533 grid connections in England and the 3,406th-largest of 3,903 in the United Kingdom by capacity; its 2 MW is <0.1% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England2,206th of 2,533319,370 MW<0.1%
United Kingdom3,406th of 3,903446,745 MW<0.1%
All grid connections in our data7,414th of 7,9281,372,494 MW<0.1%

Nearby

Within 50 km of this grid connection: 308 power plants (80 operating, 3,672 MW), 122 substations, 2 transmission lines and 1 gas storage facility, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Clough Road - Battery Energy SystemPower plant130 MWPermitted0.5 km
Sculcoates A DirectSubstation——1.0 km
Bericap, Oslo Road - Solar PanelsPower plant1.27 MWPermitted1.2 km
First AvenueSubstation——1.6 km
Energy Works (Hull)Power plant25 MWOperating1.6 km
Cornwall Street DirectSubstation——1.9 km
Continental Link Multi-Purpose InterconnectorTransmission line—Cancelled5.9 km
Aldbrough Hydrogen StorageGas storage facility—Planned18 km
North Humber to High MarnhamTransmission line—Planned49 km

Grid operator and place

More from Northern Powergrid (Yorkshire) plc

Other grid connections in England

All 3831 grid connections in England, United Kingdom