RARE CONTEXT Request research

Grid connection · England, United Kingdom

Waterloo Solar Park, Waterloo Farm grid connection

Waterloo Solar Park, Waterloo Farm grid connection is a grid connection in England, United Kingdom, with 23 MW of capacity, held by Waterloo Solar Park Limited.

Map: where Waterloo Solar Park, Waterloo Farm grid connection lies
52.1498, -0.2804 on OpenStreetMap

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEngland (connects at Little Barford 33kV)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
StatusOperating (connected)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
HolderWaterloo Solar Park LimitedUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Attached toWaterloo solar park (matched by name+coordinates+technology, 1.86 km away)Rare Context entity resolution · CC0 1.0 · checked 25 Oct 2026
Capacity23 MWUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
TechnologySolarUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Grid operatorEastern Power Networks plc (UK Power Networks, East England licence area)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Connection date19 Mar 2015UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Voltage33 kVUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Coordinates52.1498, -0.2804UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026

Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.

Latest events

Dated events about this grid connection and the records linked to it from official notices, registers and owners' press releases, newest first. All recent changes.

  1. Commissioned: Waterloo solar park
  2. Permit granted: Waterloo solar park (planning authority Central Bedfordshire, reference CB/13/03549/FULL)
  3. Permit applied for: Waterloo solar park (planning authority Central Bedfordshire, reference CB/13/03549/FULL)

How it compares

Waterloo Solar Park, Waterloo Farm grid connection is the 1,242nd-largest of 3,539 grid connections in England and the 1,806th-largest of 4,870 in the United Kingdom by capacity; its 23 MW is <0.1% of the 467,981 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England1,242nd of 3,539341,715 MW<0.1%
United Kingdom1,806th of 4,870467,981 MW<0.1%
All grid connections in our data5,177th of 8,6181,355,288 MW<0.1%

Nearby

Within 50 km of this grid connection: 481 power plants (183 operating, 3,807 MW), 166 substations and 17 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Waterloo solar parkPower plant14.6 MWOperating1.9 km
Lowfield Farm - Solar FarmPower plant26.5 MWPermitted2.0 km
Sandy Primary 11kVSubstation——2.5 km
Moggerhanger Road, Sandy - Solar FarmPower plant20 MWPlanned2.9 km
Little Barford 11kVSubstation——6.4 km
Little Barford 33kVSubstation——6.4 km
Starwood HouseData center——19 km
West Cambridge Data CentreData center——25 km
Redcentric CambridgeData center——31 km

Holder, grid operator and place

Other grid connections in England

All 4837 grid connections in England, United Kingdom

Data on this page