Power plant · Central Bedfordshire, England, United Kingdom

Moggerhanger Road, Sandy - Solar Farm

Moggerhanger Road, Sandy - Solar Farm is a planned battery storage plant in Central Bedfordshire, England, United Kingdom, with 20 MW of capacity, operated by Kach Capital Estates Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationCentral Bedfordshire (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressN/O Moggerhanger Road, Sandy, Buntingford, SG19 1NDDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPlanned (planning application submitted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date10 Mar 2022 (reference CB/22/00752/FULL, planning authority Central Bedfordshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorKach Capital Estates Limited (applicant)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity20 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyBattery (co-located with re)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates52.1275, -0.3023DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit applied for (planning authority Central Bedfordshire, reference CB/22/00752/FULL)

How it compares

Moggerhanger Road, Sandy - Solar Farm is the 973rd-largest of 1,650 power plants planned, permitted or under construction in England and the 1,574th-largest of 2,548 in the United Kingdom by capacity; its 20 MW is <0.1% of the 279,068 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
England973rd of 1,650171,264 MW<0.1%
United Kingdom1,574th of 2,548279,068 MW<0.1%
All power plants planned, permitted or under construction in our data3,589th of 5,799657,076 MW<0.1%

Nearby

Within 50 km of this power plant: 19 data centers, 1 substation and 1 AI supercomputer, measured from the coordinates in the facts above. The table shows the nearest 5, up to 3 per kind.

NameKindSizeStatusDistance
Starwood HouseData center——18 km
West Cambridge Data CentreData center——28 km
Data center, Dunstable (OSM way 526426719)Data center——29 km
East Claydon GSPSubstation——47 km
NVIDIA Cambridge-1AI supercomputer202 H100eOperating50 km

Operator and place

More from Kach Capital Estates Limited

Other power plants in England

All 5872 power plants in England, United Kingdom

Data on this page