Grid connection · England, United Kingdom

Wasing Park PV grid connection

Wasing Park PV grid connection is a grid connection in England, United Kingdom, with 3.98 MW of capacity, held by Nextenergy Solar Holdings VI Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
Name in the sourceWASING PARK PV grid connectionSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
LocationEngland (connects at Wasing Park PV)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
StatusOperating (connected)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
HolderNextenergy Solar Holdings VI LimitedSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Attached toThatcham BSP (via a bulk supply point)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Capacity3.98 MWSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
TechnologySolarSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Grid operatorSouthern Electric Power Distribution plcSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Connection date28 Mar 2017SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Voltage33 kVSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Coordinates51.3796, -1.1938SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026

Know more about this grid connection, or want an introduction to its holder? Ask us.

How it compares

Wasing Park PV grid connection is the 1,875th-largest of 2,533 grid connections in England and the 2,907th-largest of 3,903 in the United Kingdom by capacity; its 3.98 MW is <0.1% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England1,875th of 2,533319,370 MW<0.1%
United Kingdom2,907th of 3,903446,745 MW<0.1%
All grid connections in our data6,585th of 7,6161,281,251 MW<0.1%

Nearby

Within 50 km of this grid connection: 303 power plants (110 operating, 1,577 MW), 247 substations and 68 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Gravel Works, Wasing EstatePower plant5 MWOperating0.2 km
Limberlost FarmPower plant1.5 MWOperating2.5 km
Tadley PrimarySubstation——2.6 km
Harrods Distribution Centre, Mill Lane - Solar ArrayPower plant1.6 MWPermitted3.0 km
Thatcham BSPSubstation——3.7 km
Thatcham PrimarySubstation——3.8 km
Venture WestData center——6.7 km
Redcentric ReadingData center——16 km
Pulsant Reading SL3Data center——16 km

Holder, grid operator and place

More from Nextenergy Solar Holdings VI Limited

Other grid connections in England

All 3831 grid connections in England, United Kingdom

Data on this page