Grid connection · England, United Kingdom
Turret House ATE grid connection
Turret House ATE grid connection is a grid connection in England, United Kingdom, with 1.04 MW of capacity, held by British Telecommunications plc.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Name in the source | TURRET HOUSE ATE grid connection | SP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Location | England (connects at Blackfriars) | SP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Status | Operating (connected) | SP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Holder | British Telecommunications plc | SP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Capacity | 1.04 MW | SP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Technology | Oil | SP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Grid operator | Electricity North West Limited | SP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Connection date | 29 Jun 2000 | SP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Voltage | 6.6 kV | SP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Coordinates | 53.4849, -2.2554 | SP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026 |
Know more about this grid connection, or want an introduction to its holder? Ask us.
How it compares
Turret House ATE grid connection is the 2,477th-largest of 2,533 grid connections in England and the 3,820th-largest of 3,903 in the United Kingdom by capacity; its 1.04 MW is <0.1% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.
| Within | Rank | Total | Share |
|---|---|---|---|
| England | 2,477th of 2,533 | 319,370 MW | <0.1% |
| United Kingdom | 3,820th of 3,903 | 446,745 MW | <0.1% |
| All grid connections in our data | 7,524th of 7,616 | 1,281,251 MW | <0.1% |
Nearby
Within 50 km of this grid connection: 383 power plants (106 operating, 1,035 MW), 99 substations, 18 data centers and 3 gas storage facilities, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Asanti Manchester | Data center | — | — | 1.3 km |
| Salford Refuse Treatment Plant (AD) | Power plant | 2 MW | Operating | 2.3 km |
| Lunar 1&2 | Data center | — | — | 2.3 km |
| Equinix MA1 | Data center | — | — | 2.6 km |
| Ardwick Railway Goods Yard Incinerator (Newhaven EFW Plant) | Power plant | 33.5 MW | Operating | 3.5 km |
| City of Manchester Stadium | Power plant | 2 MW | Cancelled | 3.7 km |
| Todmorden | Substation | — | — | 27 km |
| Slaithwaite | Substation | — | — | 27 km |
| Meltham | Substation | — | — | 30 km |
Holder, grid operator and place
More from British Telecommunications plc
Other grid connections in England
- Bute Hydrogen Project 1 grid connection4,800 MW
- Drax BECCS grid connection3,906 MW
- Drax Power Station grid connection3,906 MW
- Bute Hydrogen Project 2 grid connection3,600 MW
- Bute Hydrogen Project 3 grid connection3,600 MW
- Bute Hydrogen Project 5 grid connection3,600 MW
- Bute Hydrogen Project 6 grid connection3,600 MW
- Hinkley Point C grid connection3,340 MW
Data on this page
- California ISO. Checked 2026-10-24. CAISO queue report, CAISO Privacy and Terms of Use.
- DESNZ Renewable Energy Planning Database (REPD). DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- SP Electricity North West, via Northern Powergrid Open Data. SP Electricity North West open data portal, CC BY 4.0.
- ERCOT GIS report. ERCOT GIS report, ERCOT Terms of Use.
- Supported by National Energy SO Open Data. NESO TEC Register, NESO Open Data Licence v1.0.
- Supported by Northern Powergrid Open Data. Northern Powergrid open data portal, Northern Powergrid Open Data Licence v1.0.
- NYISO interconnection queue. NYISO interconnection queue, Free reuse.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- PJM New Services Queue. PJM New Services Queue, Free reuse.
- SP Energy Networks, via Northern Powergrid Open Data. SP Energy Networks open data portal, CC BY 4.0.
- SSEN Distribution. SSEN Distribution data portal, CC BY 4.0.