Grid connection · England, United Kingdom
Turncole Wind Farm grid connection
Turncole Wind Farm grid connection is a grid connection in England, United Kingdom, with 18.4 MW of capacity, held by Res UK & Ireland Limited.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | England (connects at Fleethall Grid 33kV) | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Status | Operating (connected) | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Holder | Res UK & Ireland Limited | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Attached to | Turncole Wind Farm (matched by name+coordinates+technology+capacity+company, 1.98 km away) | Rare Context entity resolution · CC0 1.0 · checked 25 Oct 2026 |
| Capacity | 18.4 MW | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Technology | Wind | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Grid operator | Eastern Power Networks plc (UK Power Networks, East England licence area) | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Connection date | 1 Dec 2016 | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Voltage | 33 kV | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Coordinates | 51.6343, 0.8667 | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.
Latest events
Dated events about this grid connection and the records linked to it from official notices, registers and owners' press releases, newest first. All recent changes.
- Commissioned: Turncole Wind Farm
- Permit granted: Turncole Wind Farm (appeal granted, planning authority Maldon, reference 10/01070/FUL)
- Permit granted: Turncole Wind Farm (planning authority Maldon, reference 10/01070/FUL)
- Permit refused: Turncole Wind Farm (planning authority Maldon, reference 10/01070/FUL)
- Permit applied for: Turncole Wind Farm (planning authority Maldon, reference 10/01070/FUL)
How it compares
Turncole Wind Farm grid connection is the 1,473rd-largest of 3,539 grid connections in England and the 2,107th-largest of 4,870 in the United Kingdom by capacity; its 18.4 MW is <0.1% of the 467,981 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.
| Within | Rank | Total | Share |
|---|---|---|---|
| England | 1,473rd of 3,539 | 341,715 MW | <0.1% |
| United Kingdom | 2,107th of 4,870 | 467,981 MW | <0.1% |
| All grid connections in our data | 5,634th of 8,618 | 1,355,288 MW | <0.1% |
Nearby
Within 50 km of this grid connection: 310 power plants (131 operating, 7,750 MW), 195 substations, 8 data centers and 2 transmission lines, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Marshes Farm | Power plant | 25.5 MW | Permitted | 1.4 km |
| Wick Farm (Burnham on Crouch) | Power plant | 5 MW | Operating | 1.6 km |
| Turncole Wind Farm | Power plant | 17.5 MW | Operating | 2.0 km |
| Burnham Primary 11kV | Substation | — | — | 2.7 km |
| Tillingham Primary 11kV | Substation | — | — | 6.2 km |
| Bradwell Primary 11kV | Substation | — | — | 9.4 km |
| CityFibre Cabinets | Data center | — | — | 17 km |
| Imperium 315 | Data center | — | — | 27 km |
| Sota Datacentre | Data center | — | — | 37 km |
Holder, grid operator and place
More from Res UK & Ireland Limited
- Upper Ogmore Wind Farm25.2 MW · permitted
Other grid connections in England
- Bute Hydrogen Project 1 grid connection4,800 MW
- Drax BECCS grid connection3,906 MW
- Drax Power Station grid connection3,906 MW
- Bute Hydrogen Project 2 grid connection3,600 MW
- Bute Hydrogen Project 3 grid connection3,600 MW
- Bute Hydrogen Project 5 grid connection3,600 MW
- Bute Hydrogen Project 6 grid connection3,600 MW
- Hinkley Point C grid connection3,340 MW
Data on this page
- California ISO. CAISO queue report, CAISO Privacy and Terms of Use.
- Contains public sector information licensed under the Open Government Licence v3.0. DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- SP Electricity North West, via Northern Powergrid Open Data. SP Electricity North West open data portal, CC BY 4.0.
- ERCOT GIS report. ERCOT GIS report, ERCOT Terms of Use.
- Supported by National Energy SO Open Data. NESO TEC Register, NESO Open Data Licence v1.0.
- Supported by Northern Powergrid Open Data. Northern Powergrid open data portal, Northern Powergrid Open Data Licence v1.0.
- NYISO interconnection queue. NYISO interconnection queue, Free reuse.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- PJM New Services Queue. PJM New Services Queue, Free reuse.
- Rare Context entity resolution. Rare Context entity resolution, CC0 1.0.
- SP Energy Networks, via Northern Powergrid Open Data. SP Energy Networks open data portal, CC BY 4.0.
- SSEN Distribution. SSEN Distribution data portal, CC BY 4.0.
- UK Power Networks. UK Power Networks open data portal, CC BY 4.0.