Power plant · Maldon, England, United Kingdom

Marshes Farm

Marshes Farm is a permitted power plant in Maldon, England, United Kingdom, with 25.5 MW of capacity, operated by One Planet.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationMaldon (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressSolar Farm At, Marsh Road, Burnham-On-Crouch, Essex, CM0 8LZDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPermitted (planning permission granted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date10 Sept 2025 (permit 24/00901/FULM, Town and Country Planning Act, issued by Maldon)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date5 Dec 2024 (reference 24/00901/FULM, planning authority Maldon)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date10 Sept 2025 (granted, reference 24/00901/FULM, planning authority Maldon)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorOne Planet (applicant)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity25.5 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area43.2 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates51.6376, 0.8473DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit granted (planning authority Maldon, reference 24/00901/FULM)
  2. Permit applied for (planning authority Maldon, reference 24/00901/FULM)

How it compares

Marshes Farm is the 900th-largest of 1,651 power plants planned, permitted or under construction in England and the 1,463rd-largest of 2,549 in the United Kingdom by capacity; its 25.5 MW is <0.1% of the 279,978 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
England900th of 1,651172,174 MW<0.1%
United Kingdom1,463rd of 2,549279,978 MW<0.1%
All power plants planned, permitted or under construction in our data3,085th of 5,782643,557 MW<0.1%

Nearby

Within 50 km of this power plant: 9 data centers and 2 transmission lines, measured from the coordinates in the facts above. The table shows the nearest 5, up to 3 per kind.

NameKindSizeStatusDistance
CityFibre CabinetsData center——16 km
Imperium 315Data center——26 km
Sota DatacentreData center——37 km
Bramford to TwinsteadTransmission line—Permitted41 km
Richborough Connection ProjectTransmission line—Permitted45 km

Operator and place

Other power plants in England

All 5809 power plants in England, United Kingdom