Grid connection · England, United Kingdom

Solar 150 MW grid connection at Kenley House Generation Hub Direct

Solar 150 MW grid connection at Kenley House Generation Hub Direct is a planned grid connection in England, United Kingdom, with 150 MW of capacity, connected by Northern Powergrid (Yorkshire) plc.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEngland (connection site: Kenley House Generation Hub Direct)Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
StatusPlanned (Accepted To Connect)Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Attached toCreyke Beck (via: gsp)Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Capacity150 MWNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
TechnologySolarNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Grid operatorNorthern Powergrid (Yorkshire) plcNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Queue date19 May 2022Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Voltage132 kVNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Coordinates53.8215, -0.3538Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026

Know more about this grid connection, or want an introduction to its grid operator? Ask us.

How it compares

Solar 150 MW grid connection at Kenley House Generation Hub Direct is the 259th-largest of 2,533 grid connections in England and the 345th-largest of 3,903 in the United Kingdom by capacity; its 150 MW is <0.1% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England259th of 2,533319,370 MW<0.1%
United Kingdom345th of 3,903446,745 MW<0.1%
All grid connections in our data2,236th of 7,6161,281,251 MW<0.1%

Nearby

Within 50 km of this grid connection: 300 power plants (72 operating, 3,634 MW), 126 substations, 1 transmission line and 1 CO2 emitter, measured from the coordinates in the facts above. The table shows the nearest 8, up to 3 per kind.

NameKindSizeStatusDistance
Kenley House Farm, Ferry Road - Solar FarmPower plant49.9 MWPlanned0.1 km
Carr House Farm, Drove Lane - Solar PanelsPower plant49.9 MWPermitted1.0 km
Kenley Solar FarmPower plant49.9 MWPermitted1.0 km
Wawne RoadSubstation——2.5 km
Tiverton RoadSubstation——3.9 km
Beverley 132/33kVSubstation——4.1 km
Continental Link Multi-Purpose InterconnectorTransmission line—Cancelled4.6 km
Aldbrough Hydrogen StorageCO2 emitter—Planned18 km

Grid operator and place

More from Northern Powergrid (Yorkshire) plc

Other grid connections in England

All 3831 grid connections in England, United Kingdom

Data on this page