Grid connection · England, United Kingdom

RY South Park Farm grid connection

RY South Park Farm grid connection is a planned grid connection in England, United Kingdom, with 14.3 MW of capacity, held by Renewable Connections Solar Holdings Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
Name in the sourceRY SOUTH PARK FARM grid connectionSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
LocationEngland (connects at Melksham GSP)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
StatusPlanned (accepted to connect)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
HolderRenewable Connections Solar Holdings LimitedSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Attached toMelksham GSP (via a grid supply point)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Capacity14.3 MWSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
TechnologySolarSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Grid operatorSouthern Electric Power Distribution plcSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Queue date24 Mar 2023SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Connection date29 Oct 2027 (target energisation)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Voltage33 kVSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Coordinates51.2398, -1.6055SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026

Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.

Request research

How it compares

RY South Park Farm grid connection is the 1,222nd-largest of 2,533 grid connections in England and the 1,935th-largest of 3,903 in the United Kingdom by capacity; its 14.3 MW is <0.1% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England1,222nd of 2,533319,370 MW<0.1%
United Kingdom1,935th of 3,903446,745 MW<0.1%
All grid connections in our data5,755th of 7,9281,372,494 MW<0.1%

Timeline

Dated facts about this grid connection from its sources, oldest first.

  1. Entered the connection queue
  2. Due to connect

Nearby

Within 50 km of this grid connection: 342 power plants (137 operating, 1,775 MW), 197 substations and 18 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
South Park Solar FarmPower plant15 MWPermitted0.8 km
Perham Down - Meadow Solar Farm & Battery StoragePower plant49.9 MWPermitted1.8 km
Tidworth PrimarySubstation——3.6 km
Thruxton PrimarySubstation——3.7 km
Manor Farm (Thruxton)Power plant12.5 MWCancelled3.8 km
Park House PrimarySubstation——6.9 km
Venture WestData center——27 km
Sky ChilworthData center——33 km
AWS Swindon Data CentreData center——33 km

Holder, grid operator and place

More from Renewable Connections Solar Holdings Limited

Other grid connections in England

All 3831 grid connections in England, United Kingdom