Grid connection · England, United Kingdom

Onyx Waste grid connection

Onyx Waste grid connection is a grid connection in England, United Kingdom, with 1.45 MW of capacity, connected by Southern Electric Power Distribution plc.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
Name in the sourceONYX WASTE grid connectionSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
LocationEngland (connects at Lymington)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
StatusOperating (connected)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Attached toLymington Primary (via a primary substation)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Capacity1.45 MWSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
TechnologyWasteSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Grid operatorSouthern Electric Power Distribution plcSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Voltage11 kVSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Coordinates50.7387, -1.5631SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026

Research on this grid connection and its grid operator.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the grid operator.

Request research

How it compares

Onyx Waste grid connection is the 2,329th-largest of 2,533 grid connections in England and the 3,613th-largest of 3,903 in the United Kingdom by capacity; its 1.45 MW is <0.1% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England2,329th of 2,533319,370 MW<0.1%
United Kingdom3,613th of 3,903446,745 MW<0.1%
All grid connections in our data7,625th of 7,9281,372,494 MW<0.1%

Nearby

Within 50 km of this grid connection: 205 power plants (92 operating, 911 MW), 157 substations, 8 data centers and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Pennington Recycling CentrePower plant1.2 MWOperating0.2 km
Pennington Wastewater Treatment Works, Milford Road - Solar panelsPower plant1.28 MWPlanned0.5 km
Lower Pennington FarmPower plant2.7 MWOperating0.9 km
Milford-On-Sea PrimarySubstation——2.7 km
Lymington PrimarySubstation——3.6 km
Arnewood BSPSubstation——6.2 km
Data Vault - Bournemouth BCP01Data center——22 km
SCCData center——26 km
AstrohouseData center——27 km

Grid operator and place

More from Southern Electric Power Distribution plc

Other grid connections in England

All 3831 grid connections in England, United Kingdom