Grid connection · England, United Kingdom
Ockendon Energy Storage grid connection
Ockendon Energy Storage grid connection is a grid connection in England, United Kingdom, with 40 MW of capacity, held by Ockendon Solar Limited.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | England (connects at Warley) | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Status | Operating (connected) | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Holder | Ockendon Solar Limited | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Attached to | Ockendon Landfill Solar Farm (matched by shared name+coordinates+technology+capacity, 0.99 km away) | Rare Context entity resolution · CC0 1.0 · checked 25 Oct 2026 |
| Capacity | 40 MW | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Technology | Battery storage | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Technology | Solar | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Grid operator | Eastern Power Networks plc (UK Power Networks, East England licence area) | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Connection date | 28 Nov 2023 | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Voltage | 132 kV | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Coordinates | 51.5232, 0.3091 | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.
Latest events
Dated events about this grid connection and the records linked to it from official notices, registers and owners' press releases, newest first. All recent changes.
- Commissioned: Ockendon Landfill Solar Farm
- Permit granted: Ockendon Landfill Solar Farm (planning authority Thurrock, reference 14/00836/FUL)
- Permit applied for: Ockendon Landfill Solar Farm (planning authority Thurrock, reference 14/00836/FUL)
How it compares
Ockendon Energy Storage grid connection is the 910th-largest of 3,539 grid connections in England and the 1,297th-largest of 4,870 in the United Kingdom by capacity; its 40 MW is <0.1% of the 467,981 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.
| Within | Rank | Total | Share |
|---|---|---|---|
| England | 910th of 3,539 | 341,715 MW | <0.1% |
| United Kingdom | 1,297th of 4,870 | 467,981 MW | <0.1% |
| All grid connections in our data | 4,547th of 8,618 | 1,355,288 MW | <0.1% |
Nearby
Within 50 km of this grid connection: 497 substations, 390 power plants (152 operating, 8,326 MW), 83 data centers (1 operating, 88 MW), 1 transmission line and 1 AI supercomputer, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Ockendon Area III | Power plant | 8.5 MW | Operating | 0.9 km |
| Ockendon Landfill Solar Farm | Power plant | 38 MW | Operating | 1.0 km |
| Ockendon 'B' Landfill Scheme | Power plant | 4.5 MW | Operating | 1.1 km |
| Little Belhus Primary 11kV | Substation | — | — | 1.6 km |
| Cranham Primary 11kV | Substation | — | — | 4.3 km |
| Lakeside Primary 11kV | Substation | — | — | 4.7 km |
| Fujitsu Data Centre | Data center | — | — | 5.4 km |
| CustodianDC DA2 | Data center | — | — | 8.5 km |
| NTT London 1 | Data center | — | — | 9.6 km |
Holder, grid operator and place
- Ockendon Solar LimitedHolder
- Eastern Power Networks plcGrid operator
- Grid connections in England, United Kingdom4,837
- Grid connections in the United Kingdom6,880
- Battery storage grid connections in the UK1,141
- Solar grid connections in the UK1,755
- The United Kingdom: country profile
- Largest grid connections
More from Ockendon Solar Limited
Other grid connections in England
- Bute Hydrogen Project 1 grid connection4,800 MW
- Drax BECCS grid connection3,906 MW
- Drax Power Station grid connection3,906 MW
- Bute Hydrogen Project 2 grid connection3,600 MW
- Bute Hydrogen Project 3 grid connection3,600 MW
- Bute Hydrogen Project 5 grid connection3,600 MW
- Bute Hydrogen Project 6 grid connection3,600 MW
- Hinkley Point C grid connection3,340 MW
Data on this page
- California ISO. CAISO queue report, CAISO Privacy and Terms of Use.
- Contains public sector information licensed under the Open Government Licence v3.0. DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- SP Electricity North West, via Northern Powergrid Open Data. SP Electricity North West open data portal, CC BY 4.0.
- ERCOT GIS report. ERCOT GIS report, ERCOT Terms of Use.
- Supported by National Energy SO Open Data. NESO TEC Register, NESO Open Data Licence v1.0.
- Supported by Northern Powergrid Open Data. Northern Powergrid open data portal, Northern Powergrid Open Data Licence v1.0.
- NYISO interconnection queue. NYISO interconnection queue, Free reuse.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- PJM New Services Queue. PJM New Services Queue, Free reuse.
- Rare Context entity resolution. Rare Context entity resolution, CC0 1.0.
- SP Energy Networks, via Northern Powergrid Open Data. SP Energy Networks open data portal, CC BY 4.0.
- SSEN Distribution. SSEN Distribution data portal, CC BY 4.0.
- UK Power Networks. UK Power Networks open data portal, CC BY 4.0.