Grid connection · England, United Kingdom

Next Distribution Centre Ltd grid connection

Next Distribution Centre Ltd grid connection is a grid connection in England, United Kingdom, with 1.9 MW of capacity, held by Next Distribution Centre Ltd.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEngland (connection site: West Moor Park)Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
StatusOperating (Connected)Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
HolderNext Distribution Centre LtdNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Attached toIkea Distribution Centre (method: shared name+coordinates+technology+capacity, distance km: 0.35)Rare Context entity resolution · CC0 1.0 · checked 24 Oct 2026
Attached toWest Moor Park (via: primary)Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Capacity1.9 MWNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
TechnologySolarNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Grid operatorNorthern Powergrid (Yorkshire) plcNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Connection date13 Jul 2015Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Voltage11 kVNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Coordinates53.5395, -1.0323Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026

Know more about this grid connection, or want an introduction to its holder? Ask us.

How it compares

Next Distribution Centre Ltd grid connection is the 2,217th-largest of 2,533 grid connections in England and the 3,427th-largest of 3,903 in the United Kingdom by capacity; its 1.9 MW is <0.1% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England2,217th of 2,533319,370 MW<0.1%
United Kingdom3,427th of 3,903446,745 MW<0.1%
All grid connections in our data7,123rd of 7,6161,281,251 MW<0.1%

Nearby

Within 50 km of this grid connection: 532 power plants (153 operating, 4,518 MW), 298 substations and 2 transmission lines, measured from the coordinates in the facts above. The table shows the nearest 8, up to 3 per kind.

NameKindSizeStatusDistance
Next Distribution Centre DoncasterPower plant2.5 MWOperating0.2 km
Ikea Distribution CentrePower plant1.7 MWOperating0.3 km
West Moor ParkSubstation——0.6 km
ArmthorpeSubstation——0.8 km
Warren Farm Solar Farm & Battery StoragePower plant49.9 MWPermitted2.7 km
Markham GatesSubstation——2.7 km
North Humber to High MarnhamTransmission line—Planned14 km
Yorkshire GREENTransmission line—Permitted43 km

Holder, grid operator and place

Other grid connections in England

All 3831 grid connections in England, United Kingdom