RARE CONTEXT Request research

Grid connection · England, United Kingdom

Land Near Hadham Rd grid connection

Land Near Hadham Rd grid connection is a planned grid connection in England, United Kingdom, with 40 MW of capacity, held by Parkfield Solar Battery Limited.

Map: where Land Near Hadham Rd grid connection lies
51.8781, 0.1240 on OpenStreetMap

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEngland (connects at Bishops Stortford Grid 33kV)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
StatusPlanned (accepted to connect)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
HolderParkfield Solar Battery LimitedUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Capacity40 MWUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
TechnologyBattery storageUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
TechnologySolarUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Grid operatorEastern Power Networks plc (UK Power Networks, East England licence area)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Queue date15 Oct 2020UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Connection date31 Dec 2028 (target energisation)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Voltage33 kVUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Coordinates51.8781, 0.1240UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026

Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.

How it compares

Land Near Hadham Rd grid connection is the 910th-largest of 3,539 grid connections in England and the 1,297th-largest of 4,870 in the United Kingdom by capacity; its 40 MW is <0.1% of the 467,981 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England910th of 3,539341,715 MW<0.1%
United Kingdom1,297th of 4,870467,981 MW<0.1%
All grid connections in our data4,547th of 8,6181,355,288 MW<0.1%

Timeline

Dated facts about this grid connection from its sources, oldest first.

  1. Entered the connection queue
  2. Due to connect

Nearby

Within 50 km of this grid connection: 434 power plants (162 operating, 5,798 MW), 429 substations, 73 data centers (1 operating, 88 MW), 1 AI supercomputer and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Wickham Hall Estate - Battery StoragePower plant10 MWPermitted1.2 km
Wickham Hall Estate Solar Photovoltaic FarmPower plant20 MWPermitted1.2 km
Bishops Stortford Grid 33kVSubstation——1.2 km
Hadham RoadPower plant10 MWCancelled1.5 km
Newtown Primary 11kVSubstation——2.3 km
Hanger Lea Primary 11kVSubstation——3.2 km
Kao Data KLON-02Data center——12 km
NVIDIA Cambridge-1AI supercomputer202 H100eOperating12 km
Kao Data KLON-01Data center——12 km

Holder, grid operator and place

Other grid connections in England

All 4837 grid connections in England, United Kingdom

Data on this page