Land at Windmill Farm - Solar grid connection

Land at Windmill Farm - Solar grid connection is a planned grid connection in England, United Kingdom, with 13 MW of capacity, held by Wessex Solar Power Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
Name in the sourceLAND AT WINDMILL FARM - SOLAR grid connectionSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
LocationEngland (connection site: CIRENCESTER TOWN)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
StatusPlanned (ACCEPTED TO CONNECT)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
HolderWessex Solar Power LimitedSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Attached toCirencester Town Primary (via: primary)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Capacity13 MWSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
TechnologySolarSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Grid operatorSouthern Electric Power Distribution plcSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Queue date21 Feb 2024SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Connection date31 Oct 2028 (target energisation)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Voltage33 kVSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Coordinates51.6388, -1.8787SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026

Know more about this grid connection, or want an introduction to its holder? Ask us.

How it compares

Land at Windmill Farm - Solar grid connection is the 1,312th-largest of 2,678 grid connections in England and the 2,266th-largest of 4,493 in the United Kingdom by capacity; its 13 MW is <0.1% of the 459,551 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England1,312th of 2,678322,469 MW<0.1%
United Kingdom2,266th of 4,493459,551 MW<0.1%

Timeline

Dated facts about this grid connection from its sources, oldest first.

  1. Entered the connection queue
  2. Due to connect

Nearby

Within 50 km of this grid connection: 117 substations, measured from the coordinates in the facts above. The table shows the nearest 3.

NameKindSizeStatusDistance
Cricklade PrimarySubstation——0.9 km
Minety Village PrimarySubstation——7.0 km
Swindon BSPSubstation——7.4 km

Holder, grid operator and place

More from Wessex Solar Power Limited

Other grid connections in England

All 3977 grid connections in England, United Kingdom

Data on this page