Grid connection · England, United Kingdom
Lacey's Farm BESS grid connection
Lacey's Farm BESS grid connection is a planned grid connection in England, United Kingdom, with 924 MW of capacity, held by Bluestone Energy Ltd.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | England (connection site: South Anglia Connection Node C 400kV Substation) | NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026 |
| Status | Planned (Scoping) | NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026 |
| Holder | Bluestone Energy Ltd | NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026 |
| Attached to | Lacey's Farm BESS | NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026 |
| Capacity | 924 MW | NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026 |
| Technology | Energy Storage System | NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026 |
| Grid operator | National Grid Electricity Transmission plc | NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026 |
| Connection date | 31 Oct 2033 | NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026 |
| Connection gate | Gate 1 | NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026 |
Know more about this grid connection, or want an introduction to its holder? Ask us.
How it compares
Lacey's Farm BESS grid connection is the 143rd-largest of 2,678 grid connections in England and the 200th-largest of 4,493 in the United Kingdom by capacity; its 924 MW is 0.2% of the 459,551 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.
| Within | Rank | Total | Share |
|---|---|---|---|
| England | 143rd of 2,678 | 322,469 MW | 0.29% |
| United Kingdom | 200th of 4,493 | 459,551 MW | 0.2% |
Holder, grid operator and place
More from Bluestone Energy Ltd
- Middleton Farm BESS grid connection937 MW
- Norrington Gate Battery 150MW grid connection150 MW
- Stanley Water BESS grid connection62.9 MW
- Stanley Water BESS grid connection62.9 MW
- Linwood BESS grid connection62.9 MW
- Linwood BESS grid connection62.9 MW
- Middleton Farm grid connection36 MW
- SLG Baltic Works grid connection2.45 MW
Other grid connections in England
- Bute Hydrogen Project 1 grid connection4,800 MW
- Drax BECCS grid connection3,906 MW
- Drax Power Station grid connection3,906 MW
- Bute Hydrogen Project 2 grid connection3,600 MW
- Bute Hydrogen Project 3 grid connection3,600 MW
- Bute Hydrogen Project 5 grid connection3,600 MW
- Bute Hydrogen Project 6 grid connection3,600 MW
- Hinkley Point C grid connection3,340 MW
Data on this page
- SP Electricity North West, via Northern Powergrid Open Data. SP Electricity North West open data portal, CC BY 4.0.
- Supported by National Energy SO Open Data. NESO TEC Register, NESO Open Data Licence v1.0.
- Supported by Northern Powergrid Open Data. Northern Powergrid open data portal, Northern Powergrid Open Data Licence v1.0.
- SP Energy Networks, via Northern Powergrid Open Data. SP Energy Networks open data portal, CC BY 4.0.
- SSEN Distribution. SSEN Distribution data portal, CC BY 4.0.