Kingshill Solar grid connection is a grid connection in England, United Kingdom, with 2.8 MW of capacity, held by LHW Partnership LLP.

Map: where Kingshill Solar grid connection lies
51.2799, 0.3941 on OpenStreetMap

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEngland (connects at Mereworth 11kV)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
StatusOperating (connected)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
HolderLHW Partnership LLPUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Attached toMereworth 11kV (via a primary substation)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Attached toKingshill Solar Farm (matched by name+coordinates+technology+capacity, 0.36 km away)Rare Context entity resolution · CC0 1.0 · checked 25 Oct 2026
Capacity2.8 MWUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
TechnologySolarUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Grid operatorSouth Eastern Power Networks plc (UK Power Networks, South East England licence area)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Connection date9 Oct 2023UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Voltage11 kVUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Coordinates51.2799, 0.3941UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026

Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.

Latest events

Dated events about this grid connection and the records linked to it from official notices, registers and owners' press releases, newest first. All recent changes.

  1. Commissioned: Kingshill Solar Farm
  2. Permit granted: Kingshill Solar Farm (planning authority Tonbridge and Malling, reference KCC/TM/0209/2021)
  3. Permit applied for: Kingshill Solar Farm (planning authority Tonbridge and Malling, reference KCC/TM/0209/2021)

How it compares

Kingshill Solar grid connection is the 2,835th-largest of 3,539 grid connections in England and the 3,892nd-largest of 4,870 in the United Kingdom by capacity; its 2.8 MW is <0.1% of the 467,981 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England2,835th of 3,539341,715 MW<0.1%
United Kingdom3,892nd of 4,870467,981 MW<0.1%
All grid connections in our data7,621st of 8,6181,355,288 MW<0.1%

Nearby

Within 50 km of this grid connection: 397 substations, 347 power plants (131 operating, 6,903 MW), 58 data centers and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Kingshill Solar FarmPower plant3 MWOperating0.4 km
Blaise Farm (Farm AD)Power plant5 MWCancelled0.7 km
Offham Landfill Site - Solar PV ArrayPower plant10.2 MWUnder construction2.1 km
Mereworth 11kVSubstation——3.2 km
Wrotham Heath 11kVSubstation——4.8 km
Aylesford 6.6kVSubstation——6.1 km
CXD Infrastructure SolutionsData center——11 km
CustodianDC MaidstoneData center——11 km
CustodianDC DA2Data center——21 km

Holder, grid operator and place

Other grid connections in England

All 4837 grid connections in England, United Kingdom