Power plant · Tonbridge and Malling, England, United Kingdom

Kingshill Solar Farm

Kingshill Solar Farm is a power plant in Tonbridge and Malling, England, United Kingdom, with 3 MW of capacity, operated by Kent County Council.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationTonbridge and Malling (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressQuarrymans Road, Kings Hill, West Malling, ME19 4PNDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusOperating (operational)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Start year2024DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date29 Dec 2021 (permit KCC/TM/0209/2021, Town and Country Planning Act, issued by Tonbridge and Malling)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date24 Sept 2021 (reference KCC/TM/0209/2021, planning authority Tonbridge and Malling)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date29 Dec 2021 (granted, reference KCC/TM/0209/2021, planning authority Tonbridge and Malling)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorKent County CouncilDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity3 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area4.8 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates51.2805, 0.3890DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Know more about this power plant, or want an introduction to its operator? Ask us.

How it compares

Kingshill Solar Farm is the 2,525th-largest of 3,430 power plants in England and the 3,739th-largest of 5,050 in the United Kingdom by capacity; its 3 MW is <0.1% of the 115,642 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
England2,525th of 3,43071,985 MW<0.1%
United Kingdom3,739th of 5,050115,642 MW<0.1%
All power plants in our data9,653rd of 12,0081,173,302 MW<0.1%

Timeline

Dated facts about this power plant from its sources, oldest first.

  1. Permit issued (Town and Country Planning Act), no. KCC/TM/0209/2021
  2. Started operating

Nearby

Within 50 km of this power plant: 58 data centers, 3 grid connections (2 operating, 9.14 MW) and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 7, up to 3 per kind.

NameKindSizeStatusDistance
CXD Infrastructure SolutionsData center——11 km
CustodianDC MaidstoneData center——11 km
CustodianDC DA2Data center——21 km
Solar 6.935 MW grid connection at Maiden NewtonGrid connection6.94 MWOperating32 km
Tertiary Study grid connectionGrid connection57 MWPlanned43 km
North London (Electricity Line) ReinforcementTransmission line—Permitted47 km
Ariel Way White City London grid connectionGrid connection2.2 MWOperating49 km

Operator and place

Other power plants in England

All 5809 power plants in England, United Kingdom

Data on this page