Grid connection · England, United Kingdom
Hill Farm 240MVA grid connection
Hill Farm 240MVA grid connection is a planned grid connection in England, United Kingdom, with 240 MW of capacity, held by Green Switch Capital Limited.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | England (connects at Cheshire E) | SP Energy Networks open data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Status | Planned (accepted to connect) | SP Energy Networks open data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Holder | Green Switch Capital Limited | SP Energy Networks open data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Capacity | 240 MW | SP Energy Networks open data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Technology | Battery storage | SP Energy Networks open data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Technology | Solar | SP Energy Networks open data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Grid operator | SP Manweb | SP Energy Networks open data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Connection date | 6 Jun 2027 (target energisation) | SP Energy Networks open data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Voltage | 132 kV | SP Energy Networks open data portal · CC BY 4.0 · checked 24 Oct 2026 |
Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.
Request researchHow it compares
Hill Farm 240MVA grid connection is the 226th-largest of 2,533 grid connections in England and the 309th-largest of 3,903 in the United Kingdom by capacity; its 240 MW is <0.1% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.
| Within | Rank | Total | Share |
|---|---|---|---|
| England | 226th of 2,533 | 319,370 MW | <0.1% |
| United Kingdom | 309th of 3,903 | 446,745 MW | <0.1% |
| All grid connections in our data | 1,552nd of 7,928 | 1,372,494 MW | <0.1% |
Holder, grid operator and place
More from Green Switch Capital Limited
- Southern Upland Way BESS grid connection50 MW
- Olrig Mains Farm Wind and BESS grid connection34.4 MW
- Monashee Windfarm grid connection24 MW
- Titan Battery Storage500 MW · planned
- Wicken Bridleway, Church Road - Battery Energy Storage400 MW · permitted
- Red Moss - Battery Storage342 MW · permitted
- Wymondham Road, Bracon Ash - Battery Energy Storage System228 MW · planned
- Hill Farm, Wacton Road - Battery Energy Storage System120 MW · permitted
Other grid connections in England
- Bute Hydrogen Project 1 grid connection4,800 MW
- Drax BECCS grid connection3,906 MW
- Drax Power Station grid connection3,906 MW
- Bute Hydrogen Project 2 grid connection3,600 MW
- Bute Hydrogen Project 3 grid connection3,600 MW
- Bute Hydrogen Project 5 grid connection3,600 MW
- Bute Hydrogen Project 6 grid connection3,600 MW
- Hinkley Point C grid connection3,340 MW
Data on this page
- California ISO. CAISO queue report, CAISO Privacy and Terms of Use.
- SP Electricity North West, via Northern Powergrid Open Data. SP Electricity North West open data portal, CC BY 4.0.
- ERCOT GIS report. ERCOT GIS report, ERCOT Terms of Use.
- Supported by National Energy SO Open Data. NESO TEC Register, NESO Open Data Licence v1.0.
- Supported by Northern Powergrid Open Data. Northern Powergrid open data portal, Northern Powergrid Open Data Licence v1.0.
- NYISO interconnection queue. NYISO interconnection queue, Free reuse.
- PJM New Services Queue. PJM New Services Queue, Free reuse.
- SP Energy Networks, via Northern Powergrid Open Data. SP Energy Networks open data portal, CC BY 4.0.
- SSEN Distribution. SSEN Distribution data portal, CC BY 4.0.