Grid connection · England, United Kingdom

Hill End Farm grid connection

Hill End Farm grid connection is a grid connection in England, United Kingdom, with 2.85 MW of capacity, held by Hill End Farm Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
Name in the sourceHILL END FARM grid connectionSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
LocationEngland (connects at Hill End Farm PV)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
StatusOperating (connected)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
HolderHill End Farm LimitedSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Attached toBramley (Basi) GSP (via a grid supply point)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Attached toHill End Farm (matched by name+coordinates+technology+capacity, 0.78 km away)Rare Context entity resolution · CC0 1.0 · checked 24 Oct 2026
Capacity2.85 MWSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
TechnologySolarSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Grid operatorSouthern Electric Power Distribution plcSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Voltage33 kVSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Coordinates51.3157, -1.1181SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026

Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.

Request research

Latest events

Dated events about this grid connection and the records linked to it from official notices and registers, newest first. All recent changes.

  1. Commissioned: Hill End Farm
  2. Permit granted: Hill End Farm (planning authority Basingstoke and Deane, reference 13/01007/FUL)
  3. Permit applied for: Hill End Farm (planning authority Basingstoke and Deane, reference 13/01007/FUL)

How it compares

Hill End Farm grid connection is the 2,030th-largest of 2,533 grid connections in England and the 3,109th-largest of 3,903 in the United Kingdom by capacity; its 2.85 MW is <0.1% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England2,030th of 2,533319,370 MW<0.1%
United Kingdom3,109th of 3,903446,745 MW<0.1%
All grid connections in our data7,111th of 7,9281,372,494 MW<0.1%

Nearby

Within 50 km of this grid connection: 279 power plants (100 operating, 1,422 MW), 254 substations, 67 data centers and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Hill End FarmPower plant2.8 MWOperating0.8 km
Berry Court Solar Farm - energy storagePower plant1 MWOperating1.4 km
Berry Court FarmPower plant4.2 MWOperating1.5 km
Bramley (Ames-That) GSPSubstation——3.8 km
Bramley (Basi) GSPSubstation——3.8 km
Chineham PrimarySubstation——4.0 km
Venture WestData center——14 km
Redcentric ReadingData center——15 km
Pulsant Reading SL3Data center——16 km

Holder, grid operator and place

Other grid connections in England

All 3831 grid connections in England, United Kingdom

Data on this page