Halfway House Farm grid connection is a planned grid connection in England, United Kingdom, with 104 MW of capacity, connected by Southern Electric Power Distribution plc.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
Name in the sourceHALFWAY HOUSE FARM grid connectionSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
LocationEngland (connects at Melksham GSP)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
StatusPlanned (accepted to connect)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Attached toMelksham GSP (via a grid supply point)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Capacity104 MWSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
TechnologyBattery storageSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Grid operatorSouthern Electric Power Distribution plcSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Queue date6 Apr 2023SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Connection date15 Nov 2037 (target energisation)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Voltage132 kVSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Coordinates51.4013, -2.1263SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026

Know more about this grid connection, or want an introduction to its grid operator? Ask us.

How it compares

Halfway House Farm grid connection is the 301st-largest of 2,533 grid connections in England and the 401st-largest of 3,903 in the United Kingdom by capacity; its 104 MW is <0.1% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England301st of 2,533319,370 MW<0.1%
United Kingdom401st of 3,903446,745 MW<0.1%
All grid connections in our data2,716th of 7,6161,281,251 MW<0.1%

Timeline

Dated facts about this grid connection from its sources, oldest first.

  1. Entered the connection queue
  2. Due to connect

Nearby

Within 50 km of this grid connection: 415 power plants (168 operating, 1,942 MW), 97 substations, 7 data centers and 2 transmission lines, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Wick Farm Melksham SubstationPower plant49.9 MWUnder construction0.9 km
Melksham Substation East StoragePower plant50 MWOperating1.7 km
Melksham GSPSubstation——2.0 km
Melksham Town PrimarySubstation——3.1 km
Snarlton FarmPower plant49.9 MWCancelled3.2 km
Norrington BSPSubstation——3.6 km
Ark Data CentresData center——6.7 km
Data center, England (OSM way 996865179)Data center——6.7 km
VodafoneData center——26 km

Grid operator and place