Eastry Solar Farm grid connection

Eastry Solar Farm grid connection is a planned grid connection in England, United Kingdom, with 15.3 MW of capacity, held by Padero Solaer Limited.

Map: where Eastry Solar Farm grid connection lies
51.2675, 1.3190 on OpenStreetMap

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEngland (connects at Betteshanger)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
StatusPlanned (accepted to connect)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
HolderPadero Solaer LimitedUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Attached toBetteshanger Grid 33kV (via a primary substation)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Capacity15.3 MWUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
TechnologySolarUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Grid operatorSouth Eastern Power Networks plc (UK Power Networks, South East England licence area)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Queue date18 Sept 2025UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Voltage33 kVUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Coordinates51.2675, 1.3190UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026

Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.

How it compares

Eastry Solar Farm grid connection is the 1,565th-largest of 3,539 grid connections in England and the 2,230th-largest of 4,870 in the United Kingdom by capacity; its 15.3 MW is <0.1% of the 467,981 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England1,565th of 3,539341,715 MW<0.1%
United Kingdom2,230th of 4,870467,981 MW<0.1%
All grid connections in our data5,787th of 8,6181,355,288 MW<0.1%

Nearby

Within 50 km of this grid connection: 135 power plants (52 operating, 4,432 MW), 55 substations, 2 data centers and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Marshborough Farm solar parkPower plant5 MWOperating1.3 km
The Bunker - South East Data CentreData center——1.6 km
Former Astra Fireworks SitePower plant10 MWCancelled1.8 km
Discovery ParkPower plant16 MWOperating2.8 km
Richborough 11kVSubstation——3.4 km
Betteshanger Grid 33kVSubstation——4.7 km
Betteshanger Local 11kVSubstation——4.7 km
Richborough Connection ProjectTransmission line—Permitted7.2 km
Sota DatacentreData center——42 km

Holder, grid operator and place

More from Padero Solaer Limited

Other grid connections in England

All 4837 grid connections in England, United Kingdom

Data on this page