Grid connection · England, United Kingdom

Discovery Park grid connection

Discovery Park grid connection is a planned grid connection in England, United Kingdom, with 10 MW of capacity, held by Kent Renewable Energy Limited.

Map: where Discovery Park grid connection lies
51.2839, 1.3457 on OpenStreetMap

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEngland (connects at Richborough)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
StatusPlanned (accepted to connect)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
HolderKent Renewable Energy LimitedUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Attached toWharf Road, Discovery Park - Battery Energy Storage (matched by shared name+coordinates+technology+capacity+company, 0.88 km away)Rare Context entity resolution · CC0 1.0 · checked 25 Oct 2026
Capacity10 MWUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
TechnologyBattery storageUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Grid operatorSouth Eastern Power Networks plc (UK Power Networks, South East England licence area)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Queue date14 Mar 2025UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Voltage33 kVUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Coordinates51.2839, 1.3457UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026

Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.

Latest events

Dated events about this grid connection and the records linked to it from official notices, registers and owners' press releases, newest first. All recent changes.

  1. Permit granted: Wharf Road, Discovery Park - Battery Energy Storage (planning authority Dover, reference 23/01446)
  2. Permit applied for: Wharf Road, Discovery Park - Battery Energy Storage (planning authority Dover, reference 23/01446)

How it compares

Discovery Park grid connection is the 1,805th-largest of 3,539 grid connections in England and the 2,551st-largest of 4,870 in the United Kingdom by capacity; its 10 MW is <0.1% of the 467,981 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England1,805th of 3,539341,715 MW<0.1%
United Kingdom2,551st of 4,870467,981 MW<0.1%
All grid connections in our data6,152nd of 8,6181,355,288 MW<0.1%

Nearby

Within 50 km of this grid connection: 134 power plants (52 operating, 4,437 MW), 54 substations, 2 data centers and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Discovery ParkPower plant16 MWOperating0.2 km
Former Astra Fireworks SitePower plant10 MWCancelled0.8 km
Wharf Road, Discovery Park - Battery Energy StoragePower plant10 MWPermitted0.9 km
Richborough 11kVSubstation——0.9 km
Richborough Grid 33kVSubstation——2.7 km
The Bunker - South East Data CentreData center——3.7 km
Betteshanger Grid 33kVSubstation——6.2 km
Richborough Connection ProjectTransmission line—Permitted7.8 km
Sota DatacentreData center——43 km

Holder, grid operator and place

More from Kent Renewable Energy Limited

Other grid connections in England

All 4837 grid connections in England, United Kingdom