Grid connection · England, United Kingdom

Buncefield Lane grid connection

Buncefield Lane grid connection is a grid connection in England, United Kingdom, with 68.6 MW of capacity, connected by Eastern Power Networks plc (UK Power Networks, East England licence area).

Map: where Buncefield Lane grid connection lies
51.7672, -0.4300 on OpenStreetMap

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEngland (connects at Sundon)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
StatusOperating (connected)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Capacity68.6 MWUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
TechnologyOilUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Grid operatorEastern Power Networks plc (UK Power Networks, East England licence area)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Connection date16 May 2023UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Voltage132 kVUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Coordinates51.7672, -0.4300UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026

Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.

How it compares

Buncefield Lane grid connection is the 511th-largest of 3,539 grid connections in England and the 668th-largest of 4,870 in the United Kingdom by capacity; its 68.6 MW is <0.1% of the 467,981 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England511th of 3,539341,715 MW<0.1%
United Kingdom668th of 4,870467,981 MW<0.1%
All grid connections in our data3,634th of 8,6181,355,288 MW<0.1%

Nearby

Within 50 km of this grid connection: 501 substations, 406 power plants (149 operating, 3,673 MW), 141 data centers (1 operating, 88 MW), 1 transmission line and 1 AI supercomputer, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
G Park Maxted Road - Solar PanelsPower plant1.25 MWCancelled0.1 km
Industrial Primary 11kVSubstation——0.6 km
Amazon Boundary WayPower plant2 MWCancelled0.7 km
NTT Hemel Hempstead 3Data center——0.7 km
NTT Hemel Hempstead 2Data center——0.9 km
NTT Hemel Hempstead 4Data center——1.1 km
Hemel North Primary 11kVSubstation——1.3 km
Hemel East Primary 11kVSubstation——1.6 km
Flamsteadbury FarmPower plant4.5 MWCancelled3.0 km

Grid operator and place

More from Eastern Power Networks plc

Other grid connections in England

All 4837 grid connections in England, United Kingdom