Grid connection · England, United Kingdom

Bumpsted Hill grid connection

Bumpsted Hill grid connection is a grid connection in England, United Kingdom, with 10 MW of capacity, held by Dunmow Solar Limited.

Map: where Bumpsted Hill grid connection lies
51.8631, 0.3782 on OpenStreetMap

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEngland (connects at Braintree Local 33kV)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
StatusOperating (connected)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
HolderDunmow Solar LimitedUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Attached toDunmow Solar Farm, Chelmsford Road - Solar Farm (matched by coordinates+technology+capacity+company, 0.23 km away)Rare Context entity resolution · CC0 1.0 · checked 25 Oct 2026
Capacity10 MWUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
TechnologySolarUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Grid operatorEastern Power Networks plc (UK Power Networks, East England licence area)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Connection date9 May 2025UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Voltage33 kVUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Coordinates51.8631, 0.3782UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026

Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.

Latest events

Dated events about this grid connection and the records linked to it from official notices, registers and owners' press releases, newest first. All recent changes.

  1. Permit granted: Dunmow Solar Farm, Chelmsford Road - Solar Farm (planning authority Uttlesford, reference UTT/23/2136/FUL)
  2. Permit applied for: Dunmow Solar Farm, Chelmsford Road - Solar Farm (planning authority Uttlesford, reference UTT/23/2136/FUL)

How it compares

Bumpsted Hill grid connection is the 1,805th-largest of 3,539 grid connections in England and the 2,551st-largest of 4,870 in the United Kingdom by capacity; its 10 MW is <0.1% of the 467,981 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England1,805th of 3,539341,715 MW<0.1%
United Kingdom2,551st of 4,870467,981 MW<0.1%
All grid connections in our data6,152nd of 8,6181,355,288 MW<0.1%

Nearby

Within 50 km of this grid connection: 391 power plants (156 operating, 4,866 MW), 313 substations, 50 data centers (1 operating, 88 MW), 2 transmission lines and 1 AI supercomputer, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Dunmow Solar Farm, Chelmsford Road - Solar FarmPower plant9.89 MWUnder construction0.2 km
Dunmow Primary 11kVSubstation——0.8 km
Merks Hill Farm, Braintree Road - Solar FarmPower plant12 MWPlanned1.2 km
Tooleys FarmPower plant5.3 MWOperating2.8 km
Takeley Primary 11kVSubstation——8.0 km
Braintree Local 33kVSubstation——9.8 km
NVIDIA Cambridge-1AI supercomputer202 H100eOperating20 km
Kao Data KLON-02Data center——20 km
Kao Data KLON-01Data center——20 km

Holder, grid operator and place

More from Dunmow Solar Limited

Other grid connections in England