Britton Court Farm grid connection is a planned grid connection in England, United Kingdom, with 40 MW of capacity, held by Britton Court Energy Centre Limited.

Map: where Britton Court Farm grid connection lies
51.3140, 1.0723 on OpenStreetMap

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEngland (connects at Canterbury North 132kV)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
StatusPlanned (accepted to connect)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
HolderBritton Court Energy Centre LimitedUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Attached toBritton Court Farm, Hackington Road - Solar Farm (matched by shared name+coordinates+technology+capacity, 0.24 km away)Rare Context entity resolution · CC0 1.0 · checked 25 Oct 2026
Capacity40 MWUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
TechnologySolarUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Grid operatorSouth Eastern Power Networks plc (UK Power Networks, South East England licence area)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Queue date21 Sept 2022UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Connection date31 Oct 2036 (target energisation)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Voltage132 kVUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Coordinates51.3140, 1.0723UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026

Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.

Latest events

Dated events about this grid connection and the records linked to it from official notices, registers and owners' press releases, newest first. All recent changes.

  1. Permit granted: Britton Court Farm, Hackington Road - Solar Farm (38 MW, 56 ha, by Canterbury City Council) · source
  2. Permit granted: Britton Court Farm, Hackington Road - Solar Farm (planning authority Canterbury, reference CA/24/02283)
  3. Permit applied for: Britton Court Farm, Hackington Road - Solar Farm (planning authority Canterbury, reference CA/24/02283)

How it compares

Britton Court Farm grid connection is the 910th-largest of 3,539 grid connections in England and the 1,297th-largest of 4,870 in the United Kingdom by capacity; its 40 MW is <0.1% of the 467,981 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England910th of 3,539341,715 MW<0.1%
United Kingdom1,297th of 4,870467,981 MW<0.1%
All grid connections in our data4,547th of 8,6181,355,288 MW<0.1%

Timeline

Dated facts about this grid connection from its sources, oldest first.

  1. Entered the connection queue
  2. Due to connect

Nearby

Within 50 km of this grid connection: 209 power plants (80 operating, 7,177 MW), 119 substations, 5 data centers and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Britton Court Farm, Hackington Road - Solar FarmPower plant38 MWPermitted0.2 km
Shelford WTE PlantPower plant16.1 MWCancelled2.6 km
Shelford Generation Plant IIPower plant8 MWOperating2.7 km
Canterbury South 33kVSubstation——2.8 km
Canterbury Local 11kVSubstation——3.0 km
Canterbury Town 11kVSubstation——3.4 km
Richborough Connection ProjectTransmission line—Permitted12 km
The Bunker - South East Data CentreData center——16 km