Grid connection · England, United Kingdom

Biomass 1.432 MW grid connection at Tadcaster

Biomass 1.432 MW grid connection at Tadcaster is a grid connection in England, United Kingdom, with 1.43 MW of capacity, connected by Northern Powergrid (Yorkshire) plc.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEngland (connection site: Tadcaster)Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
StatusOperating (Connected)Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Attached toTadcaster (via: primary)Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Capacity1.43 MWNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
TechnologyBiomassNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Grid operatorNorthern Powergrid (Yorkshire) plcNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Connection date20 Apr 2009Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Voltage11 kVNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Coordinates53.8839, -1.2625Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026

Know more about this grid connection, or want an introduction to its grid operator? Ask us.

How it compares

Biomass 1.432 MW grid connection at Tadcaster is the 2,458th-largest of 2,678 grid connections in England and the 4,147th-largest of 4,493 in the United Kingdom by capacity; its 1.43 MW is <0.1% of the 459,551 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England2,458th of 2,678322,469 MW<0.1%
United Kingdom4,147th of 4,493459,551 MW<0.1%

Nearby

Within 50 km of this grid connection: 308 substations, measured from the coordinates in the facts above. The table shows the nearest 3.

NameKindSizeStatusDistance
TadcasterSubstation——0.7 km
Warren LaneSubstation——4.3 km
BramhamSubstation——4.5 km

Grid operator and place

More from Northern Powergrid (Yorkshire) plc

Other grid connections in England

All 3977 grid connections in England, United Kingdom