Grid connection · England, United Kingdom

Battery storage and Solar 199.8 MW grid connection at Loversall Hybrid Direct

Battery storage and Solar 199.8 MW grid connection at Loversall Hybrid Direct is a planned grid connection in England, United Kingdom, with 200 MW of capacity, connected by Northern Powergrid (Yorkshire) plc.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEngland (connects at Loversall Hybrid Direct)Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
StatusPlanned (accepted to connect)Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Attached toWest Melton / Thorpe Marsh (via a grid supply point)Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Capacity200 MWNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
TechnologyBattery storageNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
TechnologySolarNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Grid operatorNorthern Powergrid (Yorkshire) plcNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Queue date11 Aug 2025Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Voltage132 kVNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Coordinates53.4657, -1.1251Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026

Know more about this grid connection, or want an introduction to its grid operator? Ask us.

How it compares

Battery storage and Solar 199.8 MW grid connection at Loversall Hybrid Direct is the 245th-largest of 2,533 grid connections in England and the 328th-largest of 3,903 in the United Kingdom by capacity; its 200 MW is <0.1% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England245th of 2,533319,370 MW<0.1%
United Kingdom328th of 3,903446,745 MW<0.1%
All grid connections in our data1,963rd of 7,6161,281,251 MW<0.1%

Nearby

Within 50 km of this grid connection: 528 power plants (151 operating, 4,404 MW), 272 substations and 2 transmission lines, measured from the coordinates in the facts above. The table shows the nearest 8, up to 3 per kind.

NameKindSizeStatusDistance
Toronto Way, New Rossington Solar PanelsPower plant2.3 MWPermitted1.6 km
Amazon LBA2 (Principal Place)Power plant2 MWCancelled2.8 km
West End LaneSubstation——2.9 km
Iport Avenue, New Rossington Solar PanelsPower plant1.9 MWPermitted3.0 km
Mallard WaySubstation——4.0 km
EdlingtonSubstation——4.4 km
North Humber to High MarnhamTransmission line—Planned17 km
Yorkshire GREENTransmission line—Permitted49 km