Grid connection · England, United Kingdom

Battery storage 40 MW grid connection at Brinsworth BESS

Battery storage 40 MW grid connection at Brinsworth BESS is a planned grid connection in England, United Kingdom, with 40 MW of capacity, connected by Northern Powergrid (Yorkshire) plc.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEngland (connection site: Brinsworth BESS)Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
StatusPlanned (Accepted To Connect)Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Attached toTempleborough 275/33kV (via: bsp)Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Capacity40 MWNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
TechnologyBattery storageNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Grid operatorNorthern Powergrid (Yorkshire) plcNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Queue date19 Jan 2024Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Voltage33 kVNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Coordinates53.4008, -1.3701Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026

Know more about this grid connection, or want an introduction to its grid operator? Ask us.

How it compares

Battery storage 40 MW grid connection at Brinsworth BESS is the 760th-largest of 2,678 grid connections in England and the 1,241st-largest of 4,493 in the United Kingdom by capacity; its 40 MW is <0.1% of the 459,551 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England760th of 2,678322,469 MW<0.1%
United Kingdom1,241st of 4,493459,551 MW<0.1%

Nearby

Within 50 km of this grid connection: 276 substations, measured from the coordinates in the facts above. The table shows the nearest 3.

NameKindSizeStatusDistance
BOC BrinsworthSubstation——1.6 km
Templeborough 275/33kVSubstation——1.7 km
Fullerton RoadSubstation——1.7 km

Grid operator and place

More from Northern Powergrid (Yorkshire) plc

Other grid connections in England

All 3977 grid connections in England, United Kingdom

Data on this page