Grid connection · England, United Kingdom

Battery storage 26 MW grid connection at Elsecar Road BESS

Battery storage 26 MW grid connection at Elsecar Road BESS is a planned grid connection in England, United Kingdom, with 26 MW of capacity, connected by Northern Powergrid (Yorkshire) plc.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEngland (connects at Elsecar Road BESS)Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
StatusPlanned (accepted to connect)Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Attached toWest Melton (via a bulk supply point)Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Attached toWest Melton Electricity Substation - Energy Storage System (matched by coordinates+technology+capacity, 0.4 km away)Rare Context entity resolution · CC0 1.0 · checked 24 Oct 2026
Capacity26 MWNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
TechnologyBattery storageNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Grid operatorNorthern Powergrid (Yorkshire) plcNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Queue date29 Apr 2022Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Voltage66 kVNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Coordinates53.5035, -1.3818Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026

Research on this grid connection and its grid operator.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the grid operator.

Request research

Latest events

Dated events about this grid connection and the records linked to it from official notices and registers, newest first. All recent changes.

  1. Permit granted: West Melton Electricity Substation - Energy Storage System (planning authority Rotherham, reference RB2022/0853)
  2. Permit applied for: West Melton Electricity Substation - Energy Storage System (planning authority Rotherham, reference RB2022/0853)

How it compares

Battery storage 26 MW grid connection at Elsecar Road BESS is the 920th-largest of 2,533 grid connections in England and the 1,467th-largest of 3,903 in the United Kingdom by capacity; its 26 MW is <0.1% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England920th of 2,533319,370 MW<0.1%
United Kingdom1,467th of 3,903446,745 MW<0.1%
All grid connections in our data5,008th of 7,9281,372,494 MW<0.1%

Nearby

Within 50 km of this grid connection: 487 power plants (145 operating, 4,225 MW), 373 substations, 10 data centers and 2 transmission lines, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Swangate Project - Energy Storage SystemPower plant50 MWPermitted0.3 km
West Melton / Thorpe MarshSubstation——0.3 km
West Melton Section 3Substation——0.3 km
West Melton Electricity Substation - Energy Storage SystemPower plant26 MWPermitted0.4 km
West MeltonSubstation——0.4 km
Cranswick Convenience Foods, Valley Park Industrial Estate - Solar PanelsPower plant2.24 MWPermitted1.7 km
HSBC Data CentreData center——7.5 km
UoS IT ServicesData center——15 km
Hive ITData center——16 km

Grid operator and place

More from Northern Powergrid (Yorkshire) plc

Other grid connections in England

All 3831 grid connections in England, United Kingdom