Grid connection · England, United Kingdom
(ANM) Land On The South East Side Of Wilsons Road grid connection
(ANM) Land On The South East Side Of Wilsons Road grid connection is a planned grid connection in England, United Kingdom, with 20 MW of capacity, held by Regener8 Power Limited.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | England (connects at Histon Grid 33kV) | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Status | Planned (accepted to connect) | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Holder | Regener8 Power Limited | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Capacity | 20 MW | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Technology | Solar | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Technology | Battery storage | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Grid operator | Eastern Power Networks plc (UK Power Networks, East England licence area) | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Queue date | 16 Jun 2020 | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Connection date | 31 Oct 2028 (target energisation) | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Voltage | 33 kV | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Coordinates | 52.2197, 0.1237 | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.
How it compares
(ANM) Land On The South East Side Of Wilsons Road grid connection is the 1,321st-largest of 3,539 grid connections in England and the 1,923rd-largest of 4,870 in the United Kingdom by capacity; its 20 MW is <0.1% of the 467,981 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.
| Within | Rank | Total | Share |
|---|---|---|---|
| England | 1,321st of 3,539 | 341,715 MW | <0.1% |
| United Kingdom | 1,923rd of 4,870 | 467,981 MW | <0.1% |
| All grid connections in our data | 5,304th of 8,618 | 1,355,288 MW | <0.1% |
Timeline
Dated facts about this grid connection from its sources, oldest first.
- Entered the connection queue
- Due to connect
Nearby
Within 50 km of this grid connection: 353 power plants (152 operating, 2,864 MW), 148 substations and 7 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Thompsons Ln Primary 11kV | Substation | — | — | 1.1 km |
| Storeys Way Primary 11kV | Substation | — | — | 1.4 km |
| Arbury Grid 33kV | Substation | — | — | 1.8 km |
| Redcentric Cambridge | Data center | — | — | 2.2 km |
| West Cambridge Data Centre | Data center | — | — | 3.3 km |
| Milton Landfill Site | Power plant | 2 MW | Operating | 3.4 km |
| Low Fen, Drove Way - Solar Farm | Power plant | 50 MW | Planned | 3.8 km |
| St Bedes Inter-Church School | Power plant | 1 MW | Permitted | 4.3 km |
| Starwood House | Data center | — | — | 35 km |
Holder, grid operator and place
- Regener8 Power LimitedHolder
- Eastern Power Networks plcGrid operator
- Grid connections in England, United Kingdom4,837
- Grid connections in the United Kingdom6,880
- Battery storage grid connections in the UK1,141
- Solar grid connections in the UK1,755
- The United Kingdom: country profile
- Largest grid connections
More from Regener8 Power Limited
- The Park Farm, Birds Corner - Battery Energy Storage800 MW · planned
- Eckland Lodge Farm, Braybrooke - Battery Energy Storage System500 MW · planned
- Bury Farm, Dickens Lane - Battery Energy Storage System350 MW
- Dykewood Farm, Water End Lane - Solar Panels49.9 MW · planned
- Semere Lane, Dickleburgh - Solar Farm49.9 MW · planned
- The Park Farm, Birds Corner - Battery Energy Storage49.9 MW · planned
- Stowey Road, Stowey - Solar Farm49.9 MW · permitted
- Falcon Park, Wilsons Road - Solar Farm & Battery Energy Storage26 MW · planned
Other grid connections in England
- Bute Hydrogen Project 1 grid connection4,800 MW
- Drax BECCS grid connection3,906 MW
- Drax Power Station grid connection3,906 MW
- Bute Hydrogen Project 2 grid connection3,600 MW
- Bute Hydrogen Project 3 grid connection3,600 MW
- Bute Hydrogen Project 5 grid connection3,600 MW
- Bute Hydrogen Project 6 grid connection3,600 MW
- Hinkley Point C grid connection3,340 MW
Data on this page
- California ISO. CAISO queue report, CAISO Privacy and Terms of Use.
- Contains public sector information licensed under the Open Government Licence v3.0. DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- SP Electricity North West, via Northern Powergrid Open Data. SP Electricity North West open data portal, CC BY 4.0.
- ERCOT GIS report. ERCOT GIS report, ERCOT Terms of Use.
- Supported by National Energy SO Open Data. NESO TEC Register, NESO Open Data Licence v1.0.
- Supported by Northern Powergrid Open Data. Northern Powergrid open data portal, Northern Powergrid Open Data Licence v1.0.
- NYISO interconnection queue. NYISO interconnection queue, Free reuse.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- PJM New Services Queue. PJM New Services Queue, Free reuse.
- SP Energy Networks, via Northern Powergrid Open Data. SP Energy Networks open data portal, CC BY 4.0.
- SSEN Distribution. SSEN Distribution data portal, CC BY 4.0.
- UK Power Networks. UK Power Networks open data portal, CC BY 4.0.