Power plant · North Northamptonshire, England, United Kingdom

Eckland Lodge Farm, Braybrooke - Battery Energy Storage System

Eckland Lodge Farm, Braybrooke - Battery Energy Storage System is a planned power plant in North Northamptonshire, England, United Kingdom, with 500 MW of capacity, operated by Regener8 Power Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationNorth Northamptonshire (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressEckland Lodge Farm, Park Hill (land to West) Dingley Road (land to South), land to North of railway line, Braybrooke, LE16 8LPDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPlanned (planning application submitted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date1 Aug 2025 (reference 25/00818/FUL, planning authority North Northamptonshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorRegener8 Power LimitedDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity500 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyBattery (stand-alone storage)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates52.4559, -0.8565DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit applied for (planning authority North Northamptonshire, reference 25/00818/FUL)

How it compares

Eckland Lodge Farm, Braybrooke - Battery Energy Storage System is the 70th-largest of 2,174 power plants planned, permitted or under construction in England and the 107th-largest of 3,222 in the United Kingdom by capacity; its 500 MW is 0.17% of the 300,461 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
England70th of 2,174185,888 MW0.27%
United Kingdom107th of 3,222300,461 MW0.17%
All power plants planned, permitted or under construction in our data249th of 6,455664,040 MW<0.1%

Nearby

Within 50 km of this power plant: 9 data centers and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 4, up to 3 per kind.

NameKindSizeStatusDistance
The Horizon CentreData center——16 km
Hellermann Tyton DataData center——25 km
Santander data center, EnglandData center——28 km
Weston Marsh to East LeicestershireTransmission line—Planned38 km

Operator and place

More from Regener8 Power Limited

Other power plants in England

All 5809 power plants in England, United Kingdom