Power plant · Central Bedfordshire, England, United Kingdom
Bury Farm, Dickens Lane - Battery Energy Storage System
Bury Farm, Dickens Lane - Battery Energy Storage System is a cancelled power plant in Central Bedfordshire, England, United Kingdom, with 350 MW of capacity, operated by Regener8 Power Limited.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Central Bedfordshire (coordinates), England | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Address | Bury Farm, Dickens Lane, Tilsworth, LU7 9PX | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Status | Cancelled (planning permission refused) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Application date | 21 Jul 2025 (reference CB/25/02044/FULL, planning authority Central Bedfordshire) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Decision date | 29 Sept 2025 (refused, reference CB/25/02044/FULL, planning authority Central Bedfordshire) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Operator | Regener8 Power Limited | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Capacity | 350 MW | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Technology | Battery (stand-alone storage) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Coordinates | 51.9084, -0.5726 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
Know more about this power plant, or want an introduction to its operator? Ask us.
How it compares
Bury Farm, Dickens Lane - Battery Energy Storage System is the 33rd-largest of 3,430 power plants in England and the 45th-largest of 5,050 in the United Kingdom by capacity; its 350 MW is 0.3% of the 115,642 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.
| Within | Rank | Total | Share |
|---|---|---|---|
| England | 33rd of 3,430 | 71,985 MW | 0.49% |
| United Kingdom | 45th of 5,050 | 115,642 MW | 0.3% |
| All power plants in our data | 940th of 12,008 | 1,173,302 MW | <0.1% |
Nearby
Within 50 km of this power plant: 148 grid connections (30 operating, 328 MW), 98 substations, 85 data centers (1 operating, 88 MW) and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Data center, Dunstable (OSM way 526426719) | Data center | — | — | 5.0 km |
| Milton Keynes, Woburn Sands grid connection | Grid connection | — | — | 13 km |
| Bletchley Landfill Site grid connection | Grid connection | — | — | 13 km |
| Fenny Lock, Bletcham Way, Milton Keynes grid connection | Grid connection | — | — | 14 km |
| Data center, England (OSM way 1254986167) | Data center | — | — | 17 km |
| NTT Hemel Hempstead 2 | Data center | — | — | 18 km |
| East Claydon GSP | Substation | — | — | 23 km |
| Cokes Lane Primary | Substation | — | — | 27 km |
| Amersham GSP | Substation | — | — | 28 km |
Operator and place
More from Regener8 Power Limited
- The Park Farm, Birds Corner - Battery Energy Storage800 MW · planned
- Eckland Lodge Farm, Braybrooke - Battery Energy Storage System500 MW · planned
- Dykewood Farm, Water End Lane - Solar Panels49.9 MW · planned
- Semere Lane, Dickleburgh - Solar Farm49.9 MW · planned
- The Park Farm, Birds Corner - Battery Energy Storage49.9 MW · planned
- Stowey Road, Stowey - Solar Farm49.9 MW · permitted
- Falcon Park, Wilsons Road - Solar Farm & Battery Energy Storage26 MW · planned
- Sedgeford Hall Estate - Solar Panels & Battery Storage21 MW · permitted
Other power plants in England
- Walpole Flexible Generation Project2,000 MW
- Outer Dowsing Offshore Wind Farm1,500 MW
- Hornsea 2 - Optimus and Breesea1,320 MW
- Hornsea 1 - Heron & Njord1,218 MW
- Atlantic Array One - Bristol Channel Zone1,200 MW
- Five Estuaries - Wind Farm1,080 MW
- Rugeley Power Plant Conversion1,000 MW
- Teesworks Battery Storage Project1,000 MW
Data on this page
- DESNZ Renewable Energy Planning Database (REPD). DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- NGED Connected Data portal. NGED Connected Data portal, Terms not verified.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- Planning Inspectorate: National Infrastructure Projects. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.
- SSEN Distribution. SSEN Distribution data portal, CC BY 4.0.