RARE CONTEXT Request research

Grid connection · England, United Kingdom

(ANM) Land At Warmans Farm grid connection

(ANM) Land At Warmans Farm grid connection is a planned grid connection in England, United Kingdom, with 6 MW of capacity, held by Syzygy Renewables Limited.

Map: where (ANM) Land At Warmans Farm grid connection lies
51.8908, 0.2268 on OpenStreetMap

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEngland (connects at Stansted Airport Main Pr 11kV)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
StatusPlanned (accepted to connect)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
HolderSyzygy Renewables LimitedUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Attached toStansted Airport Main Pr 11kV (via a primary substation)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Capacity6 MWUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
TechnologySolarUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Grid operatorEastern Power Networks plc (UK Power Networks, East England licence area)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Queue date7 Aug 2021UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Connection date31 Dec 2028 (target energisation)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Voltage11 kVUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Coordinates51.8908, 0.2268UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026

Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.

How it compares

(ANM) Land At Warmans Farm grid connection is the 2,165th-largest of 3,539 grid connections in England and the 3,023rd-largest of 4,870 in the United Kingdom by capacity; its 6 MW is <0.1% of the 467,981 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England2,165th of 3,539341,715 MW<0.1%
United Kingdom3,023rd of 4,870467,981 MW<0.1%
All grid connections in our data6,701st of 8,6181,355,288 MW<0.1%

Timeline

Dated facts about this grid connection from its sources, oldest first.

  1. Entered the connection queue
  2. Due to connect

Nearby

Within 50 km of this grid connection: 411 power plants (167 operating, 5,852 MW), 378 substations, 59 data centers (1 operating, 88 MW), 2 transmission lines and 1 AI supercomputer, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Stansted Airport Main Pr 11kVSubstation——0.5 km
West MillPower plant2.5 MWOperating1.5 km
Parsonage Farm - Solar PV Farm & Battery StoragePower plant30 MWPermitted1.6 km
Tye Green FarmPower plant14.9 MWCancelled2.1 km
Takeley Primary 11kVSubstation——3.2 km
Hanger Lea Primary 11kVSubstation——4.0 km
Kao Data KLON-02Data center——15 km
NVIDIA Cambridge-1AI supercomputer202 H100eOperating15 km
Kao Data KLON-01Data center——15 km

Holder, grid operator and place

More from Syzygy Renewables Limited

Other grid connections in England

All 4837 grid connections in England, United Kingdom

Data on this page