Power plant · Milton Keynes, England, United Kingdom

Chippenham Drive, Kingston - Solar Panels

Chippenham Drive, Kingston - Solar Panels is a permitted solar power plant in Milton Keynes, England, United Kingdom, with 1.75 MW of capacity, operated by Syzygy Renewables.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationMilton Keynes (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressNorth Unit Mk 180, Chippenham Drive, Kingston, Milton Keynes, MK10 0ATDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPermitted (planning permission granted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date2 Jul 2024 (permit 24/00743/PRIOR, Town and Country Planning Act, issued by Milton Keynes)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date8 May 2024 (reference 24/00743/PRIOR, planning authority Milton Keynes)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date2 Jul 2024 (granted, reference 24/00743/PRIOR, planning authority Milton Keynes)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorSyzygy Renewables (applicant)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity1.75 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates52.0390, -0.6783DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit granted (planning authority Milton Keynes, reference 24/00743/PRIOR)
  2. Permit applied for (planning authority Milton Keynes, reference 24/00743/PRIOR)

How it compares

Chippenham Drive, Kingston - Solar Panels is the 1,464th-largest of 1,650 power plants planned, permitted or under construction in England and the 2,314th-largest of 2,548 in the United Kingdom by capacity; its 1.75 MW is <0.1% of the 279,068 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
England1,464th of 1,650171,264 MW<0.1%
United Kingdom2,314th of 2,548279,068 MW<0.1%
All power plants planned, permitted or under construction in our data5,539th of 5,799657,076 MW<0.1%

Nearby

Within 50 km of this power plant: 41 grid connections (16 operating, 167 MW), 35 substations and 16 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Pulsant Milton Keynes SE-1Data center——5.6 km
Data center, England (OSM way 460010263)Data center——5.7 km
nLighten Milton KeynesData center——9.6 km
East Claydon GSPSubstation——20 km
Pembridge Farm grid connectionGrid connection131 MWPlanned29 km
Bicester 49.9MW - PV grid connectionGrid connection44 MWPlanned31 km
Part Haveleys Solar Park grid connectionGrid connection45.5 MWPlanned31 km
Cottisford PrimarySubstation——33 km
Bicester North BSPSubstation——34 km

Operator and place

Other power plants in England

All 5872 power plants in England, United Kingdom

Data on this page