RARE CONTEXT Request research

Grid connection · England, United Kingdom

(ANM) Land At Great Wheatley Farm grid connection

(ANM) Land At Great Wheatley Farm grid connection is a planned grid connection in England, United Kingdom, with 10 MW of capacity, connected by Eastern Power Networks plc (UK Power Networks, East England licence area).

Map: where (ANM) Land At Great Wheatley Farm grid connection lies
51.5887, 0.5931 on OpenStreetMap

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEngland (connects at Rayleigh Local 33kV)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
StatusPlanned (accepted to connect)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Capacity10 MWUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
TechnologySolarUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Grid operatorEastern Power Networks plc (UK Power Networks, East England licence area)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Queue date8 Feb 2021UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Connection date30 Oct 2032 (target energisation)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Voltage33 kVUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Coordinates51.5887, 0.5931UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026

Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.

How it compares

(ANM) Land At Great Wheatley Farm grid connection is the 1,805th-largest of 3,539 grid connections in England and the 2,551st-largest of 4,870 in the United Kingdom by capacity; its 10 MW is <0.1% of the 467,981 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England1,805th of 3,539341,715 MW<0.1%
United Kingdom2,551st of 4,870467,981 MW<0.1%
All grid connections in our data6,152nd of 8,6181,355,288 MW<0.1%

Timeline

Dated facts about this grid connection from its sources, oldest first.

  1. Entered the connection queue
  2. Due to connect

Nearby

Within 50 km of this grid connection: 367 power plants (159 operating, 8,581 MW), 325 substations, 48 data centers (1 operating, 88 MW), 2 transmission lines and 1 AI supercomputer, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Rayleigh Local Primary 11kVSubstation——0.2 km
Rayleigh Local 33kVSubstation——0.3 km
Rayleigh Transforming StationPower plant10.8 MWCancelled0.3 km
Great Wheatley Road - Solar FarmPower plant30 MWUnder construction1.0 km
Fairlawns Farm, Chelmsford Road - Battery Energy StoragePower plant480 MWPermitted1.2 km
Uplands Pk Primary 11kVSubstation——1.4 km
CityFibre CabinetsData center——4.1 km
Imperium 315Data center——7.5 km
Fujitsu Data CentreData center——25 km

Grid operator and place

More from Eastern Power Networks plc

Other grid connections in England

All 4837 grid connections in England, United Kingdom

Data on this page