RARE CONTEXT Request research

Grid connection · England, United Kingdom

(ANM) Kingsey Solar Farm grid connection

(ANM) Kingsey Solar Farm grid connection is a planned grid connection in England, United Kingdom, with 7 MW of capacity, connected by Eastern Power Networks plc (UK Power Networks, East England licence area).

Map: where (ANM) Kingsey Solar Farm grid connection lies
51.7509, -0.8798 on OpenStreetMap

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEngland (connects at Ilmer Grid 33kV)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
StatusPlanned (accepted to connect)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Capacity7 MWUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
TechnologySolarUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Grid operatorEastern Power Networks plc (UK Power Networks, East England licence area)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Queue date23 Feb 2022UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Connection date31 Dec 2024 (target energisation)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Voltage33 kVUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Coordinates51.7509, -0.8798UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026

Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.

How it compares

(ANM) Kingsey Solar Farm grid connection is the 2,072nd-largest of 3,539 grid connections in England and the 2,906th-largest of 4,870 in the United Kingdom by capacity; its 7 MW is <0.1% of the 467,981 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England2,072nd of 3,539341,715 MW<0.1%
United Kingdom2,906th of 4,870467,981 MW<0.1%
All grid connections in our data6,579th of 8,6181,355,288 MW<0.1%

Timeline

Dated facts about this grid connection from its sources, oldest first.

  1. Entered the connection queue
  2. Was due to connect; the register does not list it as connected

Nearby

Within 50 km of this grid connection: 395 power plants (138 operating, 3,611 MW), 333 substations and 99 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Ilmer Grid 33kVSubstation——0.2 km
Bumpers Lane Solar FarmPower plant13.3 MWOperating0.7 km
Ilmer Primary 11kVSubstation——0.8 km
Bumpers Farm Phase 1Power plant5 MWOperating1.0 km
Bumpers Farm Phase 2Power plant12 MWCancelled1.0 km
Thame Primary 11kVSubstation——5.6 km
Data center, England (OSM way 1460602301)Data center—Under construction8.5 km
Data center, England (OSM way 1254986167)Data center——16 km
CapitaLand Ascendas REIT data center, High WycombeData center——16 km

Grid operator and place

More from Eastern Power Networks plc

Other grid connections in England

All 4837 grid connections in England, United Kingdom

Data on this page