(ANM) Firsfield Farm Aka Euston Estate grid connection

(ANM) Firsfield Farm Aka Euston Estate grid connection is a planned grid connection in England, United Kingdom, with 47 MW of capacity, held by Boom Firsfield Solar Limited.

Map: where (ANM) Firsfield Farm Aka Euston Estate grid connection lies
52.3582, 0.8325 on OpenStreetMap

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEngland (connects at Bramford)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
StatusPlanned (accepted to connect)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
HolderBoom Firsfield Solar LimitedUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Attached toFirsfield Solar Farm (matched by shared name+coordinates+technology+capacity, 1.43 km away)Rare Context entity resolution · CC0 1.0 · checked 25 Oct 2026
Capacity47 MWUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
TechnologySolarUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Grid operatorEastern Power Networks plc (UK Power Networks, East England licence area)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Queue date9 Mar 2021UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Connection date31 Oct 2031 (target energisation)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Voltage132 kVUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Coordinates52.3582, 0.8325UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026

Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.

Latest events

Dated events about this grid connection and the records linked to it from official notices, registers and owners' press releases, newest first. All recent changes.

  1. Sold: Firsfield Solar Farm (46.9 MW, to Enray Power, dated by the press release) · source
  2. Permit granted: Firsfield Solar Farm (planning authority West Suffolk, reference DC/22/0445/FUL)
  3. Permit applied for: Firsfield Solar Farm (planning authority West Suffolk, reference DC/22/0445/FUL)

How it compares

(ANM) Firsfield Farm Aka Euston Estate grid connection is the 852nd-largest of 3,539 grid connections in England and the 1,210th-largest of 4,870 in the United Kingdom by capacity; its 47 MW is <0.1% of the 467,981 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England852nd of 3,539341,715 MW<0.1%
United Kingdom1,210th of 4,870467,981 MW<0.1%
All grid connections in our data4,420th of 8,6181,355,288 MW<0.1%

Timeline

Dated facts about this grid connection from its sources, oldest first.

  1. Entered the connection queue
  2. Due to connect

Nearby

Within 50 km of this grid connection: 266 power plants (95 operating, 1,212 MW), 124 substations, 3 data centers and 2 transmission lines, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Firsfield Solar FarmPower plant46.9 MWPermitted1.4 km
Honington Primary 11kVSubstation——2.4 km
Honington Solar FarmPower plant13.6 MWOperating3.4 km
Bardwell Fields, Knox Lane - Solar FarmPower plant42 MWPlanned4.3 km
Stanton Primary 11kVSubstation——4.6 km
Thetford Grid 11kVSubstation——7.1 km
US Air Force data center, BrandonData center——20 km
Norwich to TilburyTransmission line—Planned38 km
Bramford to TwinsteadTransmission line—Permitted39 km