RARE CONTEXT Request research

Substation · the United Kingdom

Knowsley T1 / Marled HEY T1 Substation

Knowsley T1 / Marled HEY T1 Substation is a 33 kV primary substation in the United Kingdom, with 5.54 MVA of demand headroom and 2.12 MVA of generation headroom, operated by SP Manweb plc (SP Energy Networks, North Wales, Merseyside and Cheshire licence area).

Map: where Knowsley T1 / Marled HEY T1 lies
53.4366, -2.8731 on OpenStreetMap

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
Name in the sourceKNOWSLEY T1 / MARLED HEY T1SP Energy Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
LocationUnited KingdomSP Energy Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Grid operatorSP Manweb plc (SP Energy Networks, North Wales, Merseyside and Cheshire licence area)SP Energy Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Demand headroom5.54 MVASP Energy Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Generation headroom2.12 MVASP Energy Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Firm capacity10 MVASP Energy Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
LevelPrimary substationSP Energy Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Voltage33 kV (levels 33, 11 kV)SP Energy Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Coordinates53.4366, -2.8731SP Energy Networks open data portal · CC BY 4.0 · checked 25 Oct 2026

Research on this substation and the land around it.Its headroom, connection queue and congestion, who owns the land around it, and an introduction to those owners.

Nearby

Within 50 km of this substation: 458 grid connections (291 operating, 3,172 MW), 386 power plants (117 operating, 5,422 MW), 17 data centers, 3 gas storage facilities and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Alder Hey grid connectionGrid connection2 MWOperating2.3 km
Larkins Farm, Gellings Lane - Solar FarmPower plant1.5 MWCancelled2.9 km
New Broadgreen Hospital grid connectionGrid connection1.5 MWOperating3.2 km
Knowsley ERFPower plant8 MWCancelled3.3 km
D H L Exel Supply Chain Burton Foods, Portal Way - Solar PanelsPower plant1 MWPlanned3.4 km
Fazakerley - United Utilities W W T W grid connectionGrid connection1.5 MWOperating3.7 km
nLighten Edge Data Centre LiverpoolData center——12 km
The Babbage CentreData center——16 km
Data center, England (OSM way 1551100328)Data center——16 km

Grid operator and place

More from SP Manweb plc

Candidate sites around this substation

4 sites of land near Knowsley T1 / Marled HEY T1 have it as nearest substation. Each site page gives its area, its distance to the substation and its site score; owners are on request.

Other substations in the United Kingdom

All 4347 substations in the United Kingdom

Data on this page