Substation · England, United Kingdom
Warners End Primary 11kV Substation
Warners End Primary 11kV Substation is an 11 kV primary substation in England, United Kingdom, with 13.2 MVA of demand headroom and 20 MVA of generation headroom, operated by Eastern Power Networks plc (UK Power Networks, East England licence area).
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | England | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Grid operator | Eastern Power Networks plc (UK Power Networks, East England licence area) | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Demand headroom | 13.2 MVA | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Generation headroom | 20 MVA | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Firm capacity | 24 MVA | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Level | Primary substation | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Voltage | 11 kV | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Coordinates | 51.7561, -0.4945 | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
Research on this substation and the land around it.Its headroom, connection queue and congestion, who owns the land around it, and an introduction to those owners.
Nearby
Within 50 km of this substation: 399 power plants (141 operating, 2,871 MW), 347 grid connections (230 operating, 2,139 MW), 145 data centers (1 operating, 88 MW), 1 transmission line and 1 AI supercomputer, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Little Heath Lane - Solar PV Array | Power plant | 25 MW | Planned | 2.1 km |
| C2 Hall Road grid connection | Grid connection | 3 MW | Operating | 3.6 km |
| Gyron Maylands Datacentre grid connection | Grid connection | 8 MW | Operating | 3.6 km |
| NTT Hemel Hempstead 2 | Data center | — | — | 3.7 km |
| Eastman Way grid connection | Grid connection | 20 MW | Operating | 3.8 km |
| NTT Hemel Hempstead 3 | Data center | — | — | 4.1 km |
| G Park Maxted Road - Solar Panels | Power plant | 1.25 MW | Cancelled | 4.5 km |
| NTT Hemel Hempstead 4 | Data center | — | — | 4.5 km |
| Amazon Boundary Way | Power plant | 2 MW | Cancelled | 4.9 km |
Grid operator and place
More from Eastern Power Networks plc
- Canvey Primary 11kVsubstation
- Thorley Primary 11kVsubstation
- Peterborough South Grid 11kVsubstation
- Westbury Primary 11kVsubstation
- Laxfield Primary 11kVsubstation
- Fulbourn Grid 33kVsubstation
- Earlham Grid 33kVsubstation
- Hunstanton Primary 11kVsubstation
Candidate sites around this substation
2 sites of land near Warners End Primary 11kV have it as nearest substation. Each site page gives its area, its distance to the substation and its site score; owners are on request.
- 3.98 ha brownfield site at Bourne End Mills Bourne End Lane, Dacorum2.62 km · score 13
- 1.4 ha brownfield site at Former Bobsleigh Hotel, Bovingdon, Dacorum3.79 km · score 13
Other substations in England
Data on this page
- Contains public sector information licensed under the Open Government Licence v3.0. DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- UK Power Networks. UK Power Networks open data portal, CC BY 4.0.