RARE CONTEXT Request research

Substation · England, United Kingdom

Verity Way Primary 11kV Substation

Verity Way Primary 11kV Substation is an 11 kV primary substation in England, United Kingdom, with 6.3 MVA of demand headroom and 21.9 MVA of generation headroom, operated by Eastern Power Networks plc (UK Power Networks, East England licence area).

Map: where Verity Way Primary 11kV lies
51.9191, -0.1779 on OpenStreetMap

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEnglandUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Grid operatorEastern Power Networks plc (UK Power Networks, East England licence area)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Demand headroom6.3 MVAUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Generation headroom21.9 MVAUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Firm capacity24 MVAUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
LevelPrimary substationUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Voltage11 kVUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Coordinates51.9191, -0.1779UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026

Research on this substation and the land around it.Its headroom, connection queue and congestion, who owns the land around it, and an introduction to those owners.

Nearby

Within 50 km of this substation: 396 power plants (146 operating, 3,598 MW), 333 grid connections (218 operating, 2,006 MW), 85 data centers (1 operating, 88 MW), 1 AI supercomputer and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Flamingo HousePower plant1 MWOperating2.8 km
Cavendish Power grid connectionGrid connection8 MWOperating3.3 km
Cavendish Road grid connectionGrid connection10 MWOperating3.5 km
Stevenage Road, Titmore Green - Battery Energy Storage SystemPower plant57 MWPlanned4.0 km
Benington Wind FarmPower plant6.8 MWCancelled4.5 km
Solar 4 MW grid connection at Glaxo Primary 11kVGrid connection4 MWOperating4.5 km
Starwood HouseData center——7.2 km
Hertfordshire Data CentreData center——12 km
Colt London North Data CentreData center——13 km

Grid operator and place

Grid connections attached to this substation

More from Eastern Power Networks plc

Candidate sites around this substation

3 sites of land near Verity Way Primary 11kV have it as nearest substation. Each site page gives its area, its distance to the substation and its site score; owners are on request.

Other substations in England

All 2633 substations in England, United Kingdom