Power plant · North Hertfordshire, England, United Kingdom
Stevenage Road, Titmore Green - Battery Energy Storage System
Stevenage Road, Titmore Green - Battery Energy Storage System is a planned power plant in North Hertfordshire, England, United Kingdom, with 57 MW of capacity, operated by Pivoted Power Llp.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | North Hertfordshire (coordinates), England | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Address | N/O Stevenage Road, Titmore Green, Little Wymondle, Hitchin, SG4 7JR | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Status | Planned (planning application submitted) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Application date | 20 May 2025 (reference 25/01349/FP, planning authority North Hertfordshire) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Operator | Pivoted Power Llp (applicant) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Capacity | 57 MW | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Technology | Battery (stand-alone storage) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Coordinates | 51.9252, -0.2351 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.
Request researchLatest events
Dated events about this power plant from official notices and registers, newest first. All recent changes.
- Permit applied for (planning authority North Hertfordshire, reference 25/01349/FP)
How it compares
Stevenage Road, Titmore Green - Battery Energy Storage System is the 359th-largest of 1,651 power plants planned, permitted or under construction in England and the 653rd-largest of 2,549 in the United Kingdom by capacity; its 57 MW is <0.1% of the 279,978 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.
| Within | Rank | Total | Share |
|---|---|---|---|
| England | 359th of 1,651 | 172,174 MW | <0.1% |
| United Kingdom | 653rd of 2,549 | 279,978 MW | <0.1% |
| All power plants planned, permitted or under construction in our data | 1,676th of 5,782 | 643,557 MW | <0.1% |
Nearby
Within 50 km of this power plant: 79 data centers (1 operating, 88 MW), 49 substations, 15 grid connections (9 operating, 85.6 MW), 1 AI supercomputer and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Starwood House | Data center | — | — | 6.5 km |
| Hertfordshire Data Centre | Data center | — | — | 13 km |
| Colt London North Data Centre | Data center | — | — | 14 km |
| NVIDIA Cambridge-1 | AI supercomputer | 202 H100e | Operating | 31 km |
| Cokes Lane Primary | Substation | — | — | 37 km |
| North London (Electricity Line) Reinforcement | Transmission line | — | Permitted | 38 km |
| Harefield Primary | Substation | — | — | 39 km |
| Generation 99 MW grid connection at Amersham Main | Grid connection | 99 MW | Planned | 41 km |
| Amersham GSP | Substation | — | — | 41 km |
Operator and place
More from Pivoted Power Llp
Other power plants in England
- Walpole Flexible Generation Project2,000 MW
- Hornsea 2 - Optimus and Breesea1,320 MW
- Hornsea 1 - Heron & Njord1,218 MW
- Atlantic Array One - Bristol Channel Zone1,200 MW
- Five Estuaries - Wind Farm1,080 MW
- Rugeley Power Plant Conversion1,000 MW
- Teesworks Battery Storage Project1,000 MW
- Navitus Bay Wind Park970 MW
Data on this page
- Contains public sector information licensed under the Open Government Licence v3.0. DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- Epoch AI. Epoch AI supercomputers, CC BY 4.0.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- Contains public sector information licensed under the Open Government Licence v3.0. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.
- SSEN Distribution. SSEN Distribution data portal, CC BY 4.0.