Power plant · East Hertfordshire, England, United Kingdom

Benington Wind Farm

Benington Wind Farm is a cancelled power plant in East Hertfordshire, England, United Kingdom, with 6.8 MW of capacity, operated by R H Bott & Son Ltd.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEast Hertfordshire (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressLand north of the A602, south-east of Aston, and south-west of BeningtonDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusCancelled (planning permission refused)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Onshore or offshoreOnshoreDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date15 May 2008 (reference 3/08/0889/FP, planning authority East Hertfordshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date14 Jan 2009 (refused, reference 3/08/0889/FP, planning authority East Hertfordshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorR H Bott & Son LtdDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity6.8 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Units3 units (2.25 MW per unit)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyWind OnshoreDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates51.8931, -0.1277DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit refused (planning authority East Hertfordshire, reference 3/08/0889/FP)
  2. Permit applied for (planning authority East Hertfordshire, reference 3/08/0889/FP)

How it compares

Benington Wind Farm is the 1,529th-largest of 3,430 power plants in England and the 2,439th-largest of 5,050 in the United Kingdom by capacity; its 6.8 MW is <0.1% of the 115,622 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
England1,529th of 3,43071,965 MW<0.1%
United Kingdom2,439th of 5,050115,622 MW<0.1%
All power plants in our data7,952nd of 12,0321,190,447 MW<0.1%

Nearby

Within 50 km of this power plant: 86 data centers (1 operating, 88 MW), 45 substations, 14 grid connections (8 operating, 50.6 MW), 1 AI supercomputer and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Hertfordshire Data CentreData center——10 km
Colt London North Data CentreData center——11 km
Starwood HouseData center——11 km
NVIDIA Cambridge-1AI supercomputer202 H100eOperating23 km
North London (Electricity Line) ReinforcementTransmission line—Permitted33 km
Cokes Lane PrimarySubstation——39 km
Harefield PrimarySubstation——41 km
Willesden GSPSubstation——41 km
Harefield Solar grid connectionGrid connection30 MWPlanned42 km