Saunderton Primary 11kV Substation

Saunderton Primary 11kV Substation is an 11 kV primary substation in England, United Kingdom, with 9.1 MVA of demand headroom and 16.8 MVA of generation headroom, operated by Eastern Power Networks plc (UK Power Networks, East England licence area).

Map: where Saunderton Primary 11kV lies
51.7010, -0.8475 on OpenStreetMap

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEnglandUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Grid operatorEastern Power Networks plc (UK Power Networks, East England licence area)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Demand headroom9.1 MVAUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Generation headroom16.8 MVAUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Firm capacity15.2 MVAUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
LevelPrimary substationUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Voltage11 kVUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Coordinates51.7010, -0.8475UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026

Research on this substation and the land around it.Its headroom, connection queue and congestion, who owns the land around it, and an introduction to those owners.

Nearby

Within 50 km of this substation: 402 power plants (135 operating, 3,598 MW), 285 grid connections (161 operating, 1,893 MW) and 108 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Data center, England (OSM way 1460602301)Data center—Under construction2.6 km
(ANM) Whirlbush Farm grid connectionGrid connection36 MWOperating3.2 km
Forty Green FarmPower plant7.5 MWCancelled3.9 km
Hill Ground Farm grid connectionGrid connection40 MWPlanned6.0 km
(ANM) Kingsey Solar Farm grid connectionGrid connection7 MWPlanned6.0 km
Bumpers Farm Phase 1Power plant5 MWOperating6.2 km
Bumpers Farm Phase 2Power plant12 MWCancelled6.2 km
CapitaLand Ascendas REIT data center, High WycombeData center——10 km
Data center, England (OSM way 1254986167)Data center——21 km

Grid operator and place

More from Eastern Power Networks plc

Candidate sites around this substation

1 site of land near Saunderton Primary 11kV has it as nearest substation. Each site page gives its area, its distance to the substation and its site score; owners are on request.

Other substations in England

All 2633 substations in England, United Kingdom

Data on this page