Power plant · Test Valley, England, United Kingdom

Mill Lane, Nursling - Battery Storage Facility

Mill Lane, Nursling - Battery Storage Facility is a power plant under construction in Test Valley, England, United Kingdom, with 20 MW of capacity, operated by Gerard Hall Energy.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationTest Valley (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressSHB Hire Ltd, Mill Lane, Nursling, Southampton, Hampshire, SO16 0YEDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusUnder constructionDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date13 May 2020 (permit 19/02772/FULLS, Town and Country Planning Act, issued by Test Valley)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date26 Nov 2019 (reference 19/02772/FULLS, planning authority Test Valley)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date13 May 2020 (granted, reference 19/02772/FULLS, planning authority Test Valley)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorGerard Hall EnergyDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity20 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyBattery (stand-alone storage)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates50.9411, -1.4902DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Construction started
  2. Permit granted (planning authority Test Valley, reference 19/02772/FULLS)
  3. Permit applied for (planning authority Test Valley, reference 19/02772/FULLS)

How it compares

Mill Lane, Nursling - Battery Storage Facility is the 1,200th-largest of 2,174 power plants planned, permitted or under construction in England and the 1,875th-largest of 3,222 in the United Kingdom by capacity; its 20 MW is <0.1% of the 300,461 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
England1,200th of 2,174185,888 MW<0.1%
United Kingdom1,875th of 3,222300,461 MW<0.1%
All power plants planned, permitted or under construction in our data3,872nd of 6,455664,040 MW<0.1%

Nearby

Within 50 km of this power plant: 218 grid connections (123 operating, 1,148 MW), 192 substations, 8 data centers and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Nursling GSPSubstation——0.2 km
Butts Field Energy Storage grid connectionGrid connection99 MWPlanned0.3 km
Gerard Hall Battery Site grid connectionGrid connection50 MWPlanned0.3 km
SHB Hire Ltd grid connectionGrid connection50 MWPlanned0.3 km
Rownhams BSPSubstation——1.6 km
Totton PrimarySubstation——2.4 km
Sky ChilworthData center——5.0 km
Regit4uData center——17 km
SCCData center——19 km

Operator and place

Other power plants in England

All 5809 power plants in England, United Kingdom

Data on this page