Power plant · Thurrock, England, United Kingdom

Gateway Energy Centre - Battery Energy Storage

Gateway Energy Centre - Battery Energy Storage is a permitted power plant in Thurrock, England, United Kingdom, with 450 MW of capacity, operated by Intergen Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationThurrock (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressEast 2 Baltic Avenue Stanford Le Hope, SS17 9FFDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPermitted (planning permission granted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date13 Jan 2023 (permit 21/01971/FUL, Town and Country Planning Act, issued by Thurrock)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date17 Nov 2021 (reference 21/01971/FUL, planning authority Thurrock)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date13 Jan 2023 (granted, reference 21/01971/FUL, planning authority Thurrock)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorIntergen LimitedDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity450 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyBattery (stand-alone storage)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates51.5104, 0.4984DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit granted (planning authority Thurrock, reference 21/01971/FUL)
  2. Permit applied for (planning authority Thurrock, reference 21/01971/FUL)

How it compares

Gateway Energy Centre - Battery Energy Storage is the 98th-largest of 2,174 power plants planned, permitted or under construction in England and the 150th-largest of 3,222 in the United Kingdom by capacity; its 450 MW is 0.15% of the 300,461 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
England98th of 2,174185,888 MW0.24%
United Kingdom150th of 3,222300,461 MW0.15%
All power plants planned, permitted or under construction in our data319th of 6,455664,040 MW<0.1%

Nearby

Within 50 km of this power plant: 55 data centers (1 operating, 88 MW), 3 grid connections (2 operating, 9.14 MW), 1 AI supercomputer and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 8, up to 3 per kind.

NameKindSizeStatusDistance
Imperium 315Data center——8.5 km
CityFibre CabinetsData center——12 km
Fujitsu Data CentreData center——16 km
Solar 6.935 MW grid connection at Maiden NewtonGrid connection6.94 MWOperating30 km
NVIDIA Cambridge-1AI supercomputer202 H100eOperating38 km
North London (Electricity Line) ReinforcementTransmission line—Permitted39 km
Tertiary Study grid connectionGrid connection57 MWPlanned41 km
Ariel Way White City London grid connectionGrid connection2.2 MWOperating50 km