Substation · England, United Kingdom
Byfleet Grid 33kV Substation
Byfleet Grid 33kV Substation is a 33 kV primary substation in England, United Kingdom, with 30.5 MVA of demand headroom and 111 MVA of generation headroom, operated by South Eastern Power Networks plc (UK Power Networks, South East England licence area).
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | England | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Grid operator | South Eastern Power Networks plc (UK Power Networks, South East England licence area) | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Demand headroom | 30.5 MVA | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Generation headroom | 111 MVA | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Firm capacity | 104 MVA | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Level | Primary substation | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Voltage | 33 kV | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Coordinates | 51.3325, -0.4850 | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
Research on this substation and the land around it.Its headroom, connection queue and congestion, who owns the land around it, and an introduction to those owners.
Nearby
Within 50 km of this substation: 308 grid connections (203 operating, 1,862 MW), 284 power plants (100 operating, 1,635 MW), 150 data centers and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Redcentric Byfleet | Data center | — | — | 1.7 km |
| Redhill Road Biomass Power Plant | Power plant | 2.5 MW | Cancelled | 2.7 km |
| Mclaren Technology Centre, Chertsey Road - Solar Panels | Power plant | 2.56 MW | Permitted | 4.2 km |
| Land Off Board School Road grid connection | Grid connection | 1.49 MW | Operating | 4.5 km |
| Land 1A Priory Stables grid connection | Grid connection | 18 MW | Planned | 6.5 km |
| Walton Water Treatment Works grid connection | Grid connection | 1.2 MW | Operating | 6.6 km |
| Kestrel Way - Solar Panels | Power plant | 1.47 MW | Cancelled | 6.8 km |
| Digital Realty LGW14 | Data center | — | — | 7.2 km |
| Ark Data Centres - Longcross Park | Data center | — | — | 9.3 km |
Grid operator and place
More from South Eastern Power Networks plc
- Thanet Grid 33kVsubstation
- Hastings 33kVsubstation
- The Droveway 11kVsubstation
- Edenbridge 11kVsubstation
- Jarvis Brook 6.6kVsubstation
- Chatham Hill 11kVsubstation
- Selhurst 6.6kVsubstation
- Dymchurch 11kVsubstation
Other substations in England
Data on this page
- Contains public sector information licensed under the Open Government Licence v3.0. DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- UK Power Networks. UK Power Networks open data portal, CC BY 4.0.