Power plant · Woking, England, United Kingdom

Kestrel Way - Solar Panels

Kestrel Way - Solar Panels is a permitted power plant in Woking, England, United Kingdom, with 1.47 MW of capacity, operated by Digital Realty.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationWoking (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressUnit 21, Kestrel Way, Woking, GU21 3BADESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPermitted (planning permission granted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date6 Mar 2024 (permit PLAN/2024/0010, Town and Country Planning Act, issued by Woking)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date16 Jan 2024 (reference PLAN/2024/0010, planning authority Woking)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date6 Mar 2024 (granted, reference PLAN/2024/0010, planning authority Woking)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorDigital RealtyDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity1.47 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates51.3248, -0.5819DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit granted (planning authority Woking, reference PLAN/2024/0010)
  2. Permit applied for (planning authority Woking, reference PLAN/2024/0010)

How it compares

Kestrel Way - Solar Panels is the 1,953rd-largest of 2,174 power plants planned, permitted or under construction in England and the 2,948th-largest of 3,222 in the United Kingdom by capacity; its 1.47 MW is <0.1% of the 300,461 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
England1,953rd of 2,174185,888 MW<0.1%
United Kingdom2,948th of 3,222300,461 MW<0.1%
All power plants planned, permitted or under construction in our data6,168th of 6,455664,040 MW<0.1%

Nearby

Within 50 km of this power plant: 200 substations, 148 data centers, 129 grid connections (71 operating, 754 MW) and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Digital Realty LGW14Data center——0.4 km
Chobham PrimarySubstation——4.2 km
Ark Data Centres - Longcross ParkData center——6.3 km
MVEE PrimarySubstation——6.6 km
Redcentric ByfleetData center——7.5 km
Normandy PrimarySubstation——8.6 km
Waste 3.325 MW grid connection at CausewayGrid connection3.33 MWOperating11 km
Ready - 200MW Battery grid connectionGrid connection200 MWPlanned13 km
Generation 1.7 MW grid connection at Sunbury CrossGrid connection1.7 MWOperating13 km

Operator and place

More from Digital Realty

Other power plants in England

All 5809 power plants in England, United Kingdom

Data on this page